Michigan Residential Builder License Lookup: LARA Search & Verify

Michigan builder verification desk · LARA / BCC / Accela

Michigan Residential Builder License Lookup: Verify the Builder Before the Contract

The official Michigan Residential Builder search is operated through LARA Bureau of Construction Codes’ Accela Citizen Access. A useful lookup should do more than find a name: it should connect the current state license to the person or company signing the contract, the qualifying officer when a company is involved, the M&A trade when applicable, and the permit authority serving the actual job address.

This guide turns those separate government systems into one practical workflow for homeowners, builders, remodelers and applicants.

Independent resource: ContractorsBoard.org is not Michigan LARA, the Bureau of Construction Codes, the Residential Builders’ and Maintenance & Alteration Contractors’ Board, PSI, a local building department or a contractor referral service.

Michigan Residential Builder Lookup: 60-Second Answer

Open the official Accela licensee search, use the builder’s license number when available, and compare the matching government record with the person or company named in your construction contract. Michigan’s homeowner guidance says a contractor offering residential work totaling $600 or more in labor and materials generally must be licensed unless a statutory exemption applies.

License regulator LARA / BCC
Builder portal Accela ACA
Exam provider PSI
Permit authority Location-based
Do not split work to avoid the $600 rule. Michigan’s statutory exemption for small projects is not a safe way to divide one larger project into multiple sub-$600 agreements to escape licensing requirements.
MiPLUS warning: Residential Builder and Maintenance & Alteration licensing transitioned to Accela Citizen Access in August 2019. Michigan.gov contains many MiPLUS links for other professions, but the normal Residential Builder workflow is through BCC’s Accela system.
Primary search intent

How to Use the Official Michigan Residential Builder License Search

The best starting input is the license number printed on the builder’s pocket card, proposal or contract. Use names only when you do not have the number or need to resolve an identity mismatch.

Copy the license number exactly

Ask the contractor to provide the Residential Builder or M&A number in writing. Do not rely only on a logo, business card or website claim.

Open LARA’s official Accela Search for Licensee

Use the button below. A public search does not require you to purchase a commercial background report or contractor-directory membership.

Search narrowly first

Use the license number where possible. If you do not have it, use the individual’s name or business name. Avoid overfilling search fields because slight address/name formatting differences can make a correct record harder to locate.

Identify the exact credential type

Determine whether the result belongs to an Individual Residential Builder, Individual Maintenance & Alteration Contractor, Residential Builder Company or M&A Company.

Match the person or company to your contract

Compare the LARA identity with the legal name on the proposal, construction agreement, invoice and payment instructions.

Check current status and expiration

A historical license number is not enough. Use the live state record immediately before signing and again if the project begins much later.

For M&A, match the licensed trade

An M&A credential authorizes only the approved trades appearing on that license. A specialty trade credential should not be treated as unrestricted authority to build an entire house.

For a company, verify the qualifying officer

A licensed builder company depends on an appropriately licensed qualifying officer. Verify the company rather than checking only the employee or salesperson you met.

Find the permit authority for the property

Use Michigan’s Statewide Jurisdiction List because building, electrical, mechanical and plumbing enforcement can be controlled by different state or local agencies.

Save the verification in the project file

Record the date you checked the license and keep the contract, permit and insurance documents together. Reopen LARA rather than assuming a saved status remains current forever.

After the official lookup opens: search → open the matching license → note credential type → match legal identity → read current status/expiration → return here for company, M&A trade and permit checks.
Record interpretation

A Michigan License Result Is Only Useful If These Details Match

Verification item Why it matters Compare with Investigate when
License number Separates similar individuals and entities. Pocket card, proposal, contract, advertising. A contractor gives another person’s number.
Credential type Residential Builder and M&A have different scope. Actual construction scope. A specialty M&A license is represented as a full builder license.
Individual/company name The contracting party should connect to the state license. Contract, check payee, invoice, insurance. Money is requested by an unrelated person or entity.
Status An old license number may exist even when it is not currently usable. Current contract/start date. You are told “renewal is pending” but current authority is unclear.
Expiration Michigan uses three-year renewal cycles but individual expiration years differ. Expected project timeline. License expires before significant project work begins.
M&A trade M&A authority is limited to listed trades. Roofing, masonry, siding, concrete, etc. The trade being sold is not on the license.
Company / QO relationship The company must maintain a qualifying officer. Company and individual builder records. Only an employee’s individual license is shown for a company contract.
Physical verification matters too: Michigan’s homeowner guidance says contractors and salespersons carry a pocket card and the state license is displayed at the business location. Ask to see the pocket card—but treat the live LARA search as the freshness check.

Michigan Builder Record Match Helper

Use this only after opening LARA. This independent tool does not query or verify a government database.

Complete all six items using current state/local information.
Information-gain check

The Three-Record Michigan Builder Identity Check

A common verification mistake is searching the individual builder but contracting with an LLC. For a business project, check all relevant layers.

1. Individual license

Confirms the Residential Builder or M&A credential held by the qualifying person.

2. Company builder license

Confirms that the LLC, corporation or other business contracting with you holds its own Michigan builder-company credential when required.

3. Business entity record

Separately confirm that the legal company/assumed name corresponds with Michigan business-entity records.

Do not accept “our employee is licensed” as the entire company check. Michigan provides a separate Residential Builder Company / M&A Company licensing process, and the company must have a licensed qualifying officer.
Scope resolver

Residential Builder vs Maintenance & Alteration Contractor

Individual Residential Builder

The current Michigan application describes this license as allowing the person to construct a complete residential structure and perform maintenance, alteration and remodeling work subject to Michigan laws, code and separately regulated trades.

Current initial fee: $195.

Maintenance & Alteration Contractor

An M&A contractor is licensed for one or more specific trades. Verify the exact trade appearing on the government credential before treating it as authority for that scope.

Current initial fee: $195.

Trades currently listed on the July 2026 individual application

Code M&A trade Practical verification
ACarpentryConfirm carpentry appears on the license.
BConcreteConfirm concrete authority for the contracted work.
DExcavationDo not infer unrelated building authority.
GInsulation WorkEnergy-program registration may be additional.
IMasonryMatch masonry work to credential.
KSidingConfirm siding trade is shown.
MRoofingA roofing M&A credential is not a full-home builder license.
NScreens & Storm SashScope is specialty-specific.
OGuttersMatch gutter work directly.
PTile & MarbleConfirm listed trade.
RHouse WreckingOther demolition/local permit requirements may apply.
SSwimming PoolsLocal zoning/building rules are separate.
TBasement WaterproofingMatch the specific waterproofing scope.
Use the current application rather than an old trade list. Michigan has changed form content over time. The July 2026 BCC-2000 application should be the current application reference for a new individual filing.
Company verification

Residential Builder Company + Qualifying Officer: Verify Both

The current company application tells applicants not to submit the company application until a licensed qualifying officer exists.

Search the company license

Use LARA Accela with the company legal/assumed name or license number.

Identify the qualifying officer

Confirm the appropriately licensed individual associated with the company rather than assuming the salesperson or jobsite supervisor is the QO.

Check the individual QO credential

Verify that the qualifying officer’s individual license is current.

Compare company name with Michigan entity records

The current company application requires company and assumed names to correspond with Corporations Division records.

Match the project contract

The business signing the contract and receiving payment should make sense when compared with the licensed company and entity records.

Renewal dependency: LARA says a builder company cannot operate without a qualifying officer. If the qualifying officer does not renew the individual license, the company can be placed in a Section 2405 suspension status.
Location-specific layer

Michigan Building Permit Lookup: State BCC or Local City/Township?

Michigan’s codes are statewide, but enforcement is distributed. A county, city, village, township or LARA/BCC can control the project permit—and building, electrical, mechanical and plumbing may not all be handled by the same agency.

BLDG

Building construction / structural permit authority.

ELEC / MECH / PLBG

Electrical, mechanical and plumbing enforcement can differ from BLDG.

Municipality matters

The mailing city is not always the legal township/city enforcing the code. Verify the actual governmental unit.

Step-by-step: use Michigan’s Statewide Jurisdiction List

  1. Open the official Statewide Jurisdiction List PDF.
  2. Identify the project’s exact county.
  3. Find the exact city, village, township or other governmental unit.
  4. Read the BLDG column.
  5. Read ELEC, MECH and PLBG separately.
  6. If BCC is the enforcing agency, use the LARA state permit workflow.
  7. If a local governmental unit is shown, use that local building/codes office.
  8. Ask which inspections are required and who must request them.
  9. Put permit responsibility into the written construction agreement.
Permit-required baseline: BCC says a building permit is required before constructing a building/structure and can also be required for a change in use or occupancy, subject to code exemptions for qualifying ordinary repairs.
Ordinary repair is not a blanket exemption. Structural alterations and regulated electrical, plumbing, mechanical or other health/safety work are not automatically treated as permit-free ordinary repairs.
State permit help: when BCC is the enforcing agency, current building-permit questions can be directed to 517-241-9313 or bccpermits@michigan.gov.
Major Michigan permit desks

Detroit, Grand Rapids, Flint, Ann Arbor & Lansing Permit Starting Points

These shortcuts help users in major markets avoid starting with a 111-page statewide PDF. Still verify the exact municipality because a postal address using a city name may actually sit in another township or jurisdiction.

Area Official starting office Current practical contact After opening the link
Detroit Buildings, Safety Engineering & Environmental Department (BSEED) Customer service: 313-224-3202
Construction inspection: 313-596-2954
Open BSEED → choose permits/eLAPS → contractors should connect their license information to the permit account → upload plans through the required electronic process when applicable → do not begin work before the required permit.

Official Detroit BSEED
Grand Rapids Development Center 616-456-4100
devcenter@grcity.us
1120 Monroe Ave NW, 3rd Floor
Open the Development Center → select the residential permit needed → register the applicable Michigan contractor license with the city if required for online access → submit permit → use the permit/address to schedule inspections.

Official Grand Rapids Development Center
Flint Building & Safety Inspections 810-766-7284
1101 S. Saginaw St., Room S106
Open Building & Safety → choose the current building/electrical/plumbing/mechanical permit form → verify public-office hours before visiting → submit through the city’s current process → use the same office to coordinate inspections.

Official Flint Building & Safety
Ann Arbor City construction / building services 734-794-6269
building@a2gov.org
301 E. Huron St.
Use the city’s current development/building route, provide the exact property address and project type, and confirm which building/trade permit applications and inspections apply before work begins.

Official Ann Arbor Contact Directory
Lansing City of Lansing permits / city service routing 3-1-1 inside city service area Open the city permit portal → choose the applicable permit category → if the exact enforcing office is unclear, use Lansing 3-1-1 to route the project-address question rather than assuming the state BCC office handles it.

Official Lansing Permits
Local contacts change faster than state licensing law. Use these as official starting points and reconfirm the phone, office hours and submission method on the linked city page immediately before visiting or mailing documents.
Homeowner due diligence

Michigan Homeowner Checklist: License, Contract, Permits, Insurance & Payments

Michigan LARA’s own homeowner guidance goes much further than “check the license.” Use these practical controls before signing.

Before selecting the contractor

  • Search the exact license in LARA Accela.
  • Ask to see the pocket card.
  • Check for a permanent business location and working telephone number.
  • Request and contact prior customer references.
  • Ask references whether problems were corrected.
  • Get multiple written estimates.
  • Compare actual materials/brands/grades/models—not only bottom-line price.
  • Identify the building and trade permit authority before work starts.

Put these items in the written construction agreement

  • Licensed company/person name, address and telephone.
  • Builder and salesperson names where applicable.
  • Applicable Michigan license number(s).
  • Detailed project scope.
  • Materials, brands, grades, styles and model numbers where relevant.
  • Total contract price.
  • Payment schedule.
  • Start date and expected completion date.
  • Who obtains required permits and variances.
  • Liability-insurance expectations.
  • Workers’ compensation expectations where applicable.
  • Written warranty terms.
  • Cleanup and debris-removal responsibility.
  • How change orders / extras are approved and priced.
Do not pay the entire project in advance. Michigan’s homeowner guidance recommends linking payments to materials/startup and progress rather than paying the full contract up front. Pay the contracting company shown in your documents and keep receipts.
Permit verification can catch identity problems. Ask which party is pulling the permit and check the permit applicant against the company/person you verified in LARA.

Three-day cancellation guidance

Michigan’s homeowner page states that where a consumer was solicited and signed the contract in the home, the consumer has three days to cancel and should send written cancellation by registered letter.

Transaction-specific rule: do not assume every construction agreement receives the same cancellation right. How and where the contract was solicited/signed can matter.

No current Homeowner Construction Lien Recovery Fund

Michigan LARA states that the Homeowner Construction Lien Recovery Fund was abolished in August 2010. Pages promising access to a current Michigan builder recovery fund are outdated.
Portal troubleshooting

Accela Citizen Access Help: Register, Link a License, Renew & Avoid Duplicate Applications

A portal problem is not a reason to submit a second license application. LARA publishes specific Accela help for account registration, linking licenses, renewals, address updates and permits.

Create an Accela account

  1. Open Accela Citizen Access.
  2. Use the account-registration option.
  3. Create the login and verify requested account details.
  4. Return to the dashboard after registration.
  5. Use LARA’s Accela FAQ if the account cannot be completed.

Link an existing builder license

  1. Sign into the correct Accela account.
  2. Use LARA’s “link a license” instructions.
  3. Enter the existing state license information.
  4. Confirm it appears in the account before attempting renewal/modification.
  5. If linking fails, contact BCC technical support rather than applying for a duplicate license.

Renew an individual license

  1. Wait until the renewal is available within the current renewal window.
  2. Link the license if needed.
  3. Use the linked account or eligible Express Pay route.
  4. Complete the transaction.
  5. Recheck public license status after processing.

Renew a company license

  1. Sign into Accela.
  2. Confirm the company license is linked.
  3. Verify the qualifying officer’s individual license is also being maintained.
  4. Use the company renewal workflow.
  5. Do not use Express Pay for a builder-company renewal.
Technical support: LARA’s Accela resources list LARA-BCC-Service@Michigan.gov for BCC online-service technical assistance.
Duplicate-application warning: LARA states that submitting the same application online and by mail does not speed processing and can delay review. Application fees are nonrefundable.
2026 impersonation warning: LARA warns consumers/licensees about fraudulent messages impersonating the department. Verify enforcement or licensing messages through Michigan.gov/LARA and official contact information before providing sensitive information.
Applicant pathway

Michigan 60-Hour Residential Builder Prelicense Education

A new Individual Residential Builder or M&A applicant normally completes 60 hours of approved prelicense education before the license application/testing process unless a qualifying military exemption applies.

Required subject Minimum hours
Business Management, Estimating & Job Costing6
Design & Building Science6
Contracts, Liability & Risk Management6
Marketing & Sales6
Project Management & Scheduling6
Current Michigan Residential Code6
MIOSHA Construction Safety Standards6
Approved electives18

How to verify a course before paying

  1. Open LARA’s current Approved Residential Builder Prelicensure and Continuing Education PDF.
  2. Locate the provider/course.
  3. Confirm it is marked P for Prelicensure.
  4. Confirm the credit hours total.
  5. Read the delivery type.
  6. Check approval/expiration dates.
  7. Save the final completion certificate for the state application.
Current list: the LARA 2026–2029 approved-course PDF reviewed for this article is dated June 29, 2026 and includes classroom, home-study, hybrid and online course options.
Do not choose a provider from advertising alone. The authoritative check is whether the exact course appears on LARA’s current approved list for the correct credit type and approval period.
Current BCC-2000

How to Apply for a Michigan Residential Builder License

The current individual application is BCC-2000, revised July 2026. Build the document file first; then submit through the current LARA/Accela process.

Choose Residential Builder OR M&A

The current individual application says the applicant cannot select both license types on the same application.

Complete approved 60-hour education

Retain the completion certificate unless LARA has approved a qualifying armed-forces education waiver.

Prepare state-issued photo ID

If the ID is from a state other than Michigan, review the current notarized Consent to Service of Process requirement.

Use a physical Michigan business address

The July 2026 individual application states that the business address cannot be a P.O. Box.

Do not put an LLC on the individual application

The individual application is for the person. After the individual license is issued, a separate company application can be filed if an LLC/corporation will operate as the licensed company.

Submit the application and current fee

The current initial Individual Residential Builder or Individual M&A application fee is $195. A qualifying veteran initial-fee waiver may apply.

Wait for LARA authorization to test

Residential Builder/M&A applicants do not simply register with PSI first. LARA reviews the application and sends approved eligibility to PSI.

Schedule and pass PSI

Complete the required testing within the state’s one-year application period.

Confirm issuance in Accela

Passing an examination is not the same as independently verifying that the government has issued a current builder credential. Check the official record after processing.

Processing-time planning: LARA’s Licensing Section currently warns that application processing may take up to approximately 3–5 weeks and that submissions are reviewed in the order received. Missing information can extend the timeline.
Current individual transaction Fee Important detail
Residential Builder initial $195 Nonrefundable application fee.
M&A initial $195 Select current trade(s).
Residential Builder relicensure $185 Current BCC-2000 describes relicensure for an individual credential expired more than three years; original license number is required.
M&A relicensure $185 Current requirements/testing apply.

Michigan Builder Application Readiness Helper

Check only items actually prepared. This independent checklist does not submit or preapprove a LARA application.

Initial individual builder/M&A file
Mark completed items first.
Examination desk

Michigan Residential Builder PSI Exam: Exact Sequence, Fee, Score & Test Centers

Sequence matters: Individual Residential Builder and M&A applicants first apply to LARA. After LARA approves the candidate to test, authorization is transmitted to PSI.
Builder exam fee $117
Total questions 160
Passing raw score 116
Time 240 min

After LARA says you are approved to test

  1. Allow the eligibility information to reach PSI.
  2. LARA’s current exam page says PSI should contact approved candidates within about 10 business days.
  3. Open the official Michigan PSI test-taker portal.
  4. Create/sign into the candidate account.
  5. Select the Residential Builder exam you were authorized to take.
  6. Pay the current listed $117 combined-builder exam fee.
  7. Select an available Michigan testing center.
  8. Make the registration name match your acceptable government-issued identification.
  9. Take the exam.
  10. Keep the score report and monitor LARA processing.
Current remote-testing boundary: BCC’s current exam page specifically identifies remote online testing for Plumbing Contractor/Master Plumber exams. Do not assume the Residential Builder exam is remote; plan around the PSI test-center scheduling options actually offered to you.

Currently listed Michigan PSI centers

Area Address listed in the current LARA-linked PSI handbook Travel rule
Dearborn3200 Greenfield Rd., Suite 253, Dearborn, MI 48120Confirm in live scheduler before travel.
Holt / Lansing4202 Charlar Drive, Suite 1, Holt, MI 48842Confirm in live scheduler.
Southfield — Northland16250 Northland Dr., Suite 361, Southfield, MI 48075Confirm in live scheduler.
Southfield — Lahser26400 Lahser Rd., Suite 150, Southfield, MI 48033Confirm in live scheduler.
Grand Rapids4595 Broadmoor Ave. SE, Suite 201, Grand Rapids, MI 49512Confirm in live scheduler.
Gaylord440 W. Main St., Suite D, Gaylord, MI 49735Confirm in live scheduler.
Marquette1229 W. Washington St., Marquette, MI 49855Confirm in live scheduler.
Live scheduler controls. Test-center availability and addresses can change faster than a PDF. Verify the final site and appointment inside PSI before booking travel.

M&A testing fees

Testing combination Current PSI fee
One portion$70
Two portions$99
Three portions$114
English and Spanish: BCC currently states that Individual Residential Builder and M&A examinations are available in English and Spanish. Confirm the current Spanish scheduling method directly with PSI when booking.
One-year application clock: LARA’s current exam guidance says the application remains active for a one-year period from the applicable state review point. If the required exams are not completed in that window, the applicant must reapply and obtain authorization again.

PSI candidate support: 855-579-4635.

License maintenance

Michigan Residential Builder Renewal, Late Fees & Continuing Competency

Residential Builder and M&A credentials generally renew every three years by May 31, but not every license is on the same three-year cohort. Always read the expiration on the live license record.

Renewal item Current guidance What to do
Renewal availability Up to 90 days before expiration. Log into/link Accela before the deadline.
Normal renewal fee $150. Complete current state renewal.
Late fee $20 after expiration. Do not delay renewal simply because late processing exists.
More than 60 days late Late fee increases to $35. Follow current Accela/LARA instructions.
Individual renewal Eligible Express Pay or linked Accela account. Use the current individual workflow.
Company renewal Accela login required; company cannot use Express Pay. Also maintain the qualifying officer’s individual license.

Continuing competency hours

First or second renewal cycle

21 hours under current LARA guidance.

Third or later renewal cycle

3 hours under current LARA guidance.

Current core topic requirements include education addressing building codes/laws, safety, and changes in construction/business-management laws.

Proof retention: individual builders generally retain course records rather than automatically submitting every certificate with renewal unless audited or otherwise requested.
Company owners: renewing the company without maintaining the qualifying officer can cause a company-license problem. Treat the individual and company renewals as connected tasks.
Official document desk

Michigan Residential Builder PDFs & Forms: What to Do After Opening Each File

BCC-2000
Individual Application

Use for: initial Individual Residential Builder / Individual M&A or applicable individual relicensure.

After opening: verify the revision → choose only one license type → review current fee → attach state ID → add Consent to Service if required → attach 60-hour certificate or approved military documentation → use physical Michigan business address → sign/certify → submit through the current state route.
BCC-2030
Company Application

Use for: Residential Builder Company or M&A Company.

After opening: stop if no qualifying officer is licensed → match legal/assumed company name with Corporations Division → identify QO and license number → complete owners/officers/members → review nonresident Consent to Service instructions → pay current $195 initial company fee.
2026–2029
Approved Courses

Use for: verifying 60-hour prelicense and approved continuing-education courses.

After opening: locate the exact course → identify P or CE designation → read credit hours → check delivery format → check approval/expiration → save course identification before paying the provider.
PSI Builder
Candidate Handbook

Use for: current exam fee, scheduling, identification, exam structure, test centers and exam rules.

After opening: find the Residential Builder section → confirm current $117 combination exam fee → review the 160-question / 240-minute test → read ID/security rules → check test-center addresses → then use the live PSI scheduler for the final appointment.
Continuing Competency

Use for: deciding whether the individual requires 21 hours or 3 hours for the upcoming renewal cycle.

After opening: determine which renewal cycle applies → read required subject areas → choose an approved course → retain completion documentation for audit.
BCC-ES-100
Statement of Complaint

Use for: documented construction/licensing complaints within BCC jurisdiction.

After opening: calculate the filing deadline first → enter respondent/license → identify job jurisdiction → list factual allegations → attach contract/payment/permit/inspection/correspondence/photos → sign → email/mail to Enforcement → keep copies.
Statewide Jurisdiction List

Use for: identifying building/electrical/mechanical/plumbing enforcing agencies.

After opening: locate county → exact city/township/village → read BLDG → ELEC → MECH → PLBG individually → contact each required enforcing authority → verify permit/inspection submission before work.
Enforcement

Michigan Residential Builder Complaint: Deadline, Evidence & Correct Agency

The current Statement of Complaint is BCC-ES-100, revised April 2026. Calculate jurisdiction and deadline before assembling a large evidence file.

Residential-building complaint timing

Maintenance / alteration project

BCC says a residential building complaint generally must reach the Department within 18 months after the applicable latest completion, occupancy or purchase event.

Project requiring an occupancy permit

The current form identifies the applicable latest temporary certificate of occupancy, final certificate of occupancy or closing event for the deadline calculation.

Skilled trades use a different deadline. The current BCC complaint form generally uses a 12-month timing rule for skilled-trade complaints tied to the applicable last work, final inspector approval or payment event. Do not automatically apply the Residential Builder 18-month rule to plumbing/electrical/mechanical complaints.

Before opening the complaint form

  • Identify whether BCC or a local enforcing agency has jurisdiction.
  • Calculate the filing deadline.
  • Save the builder’s current LARA license record.
  • Copy the full signed contract.
  • Include all estimates/quotes/change orders.
  • Include proof of payments.
  • Obtain permit and inspection records.
  • Include written correspondence and responses.
  • Make notes of verbal responses, including dates.
  • Use clear dated photographs.
  • Include relevant court documents if litigation already occurred.
  • Do not submit sensitive personal identifiers unless specifically required.
BCC cannot act as your civil court. The current complaint form says BCC cannot order a refund, cancel a contract or provide legal advice. Licensing enforcement and private contract/damages remedies are separate.
Local code issue first? BCC’s complaint instructions say matters under local/county code enforcement should first be directed to the local enforcing agency. The Statewide Jurisdiction List helps identify that office.

Mail complaint

Michigan Department of Licensing and Regulatory Affairs
Bureau of Construction Codes — Enforcement Section
P.O. Box 30254
Lansing, MI 48909

Enforcement phone: 517-241-9309.

Regulatory history

How to Check Michigan Builder Final Decisions Without Confusing Them With Complaints

A complaint is an allegation; a final administrative order is a regulatory outcome. When researching discipline, keep those concepts separate.

  1. Open the official Residential Builders’ and Maintenance & Alteration Contractors’ Board page.
  2. Locate final decisions/orders or the relevant board-meeting material.
  3. Search the builder/company name or license number.
  4. Read the order date and actual disposition.
  5. Do not treat an old order as the current license status.
  6. Return to Accela and verify today’s credential status separately.
Why both checks matter: Accela answers the present license-status question; final orders provide historical regulatory context when a public decision exists.
Michigan-specific assistance

Michigan Builder Benefits, Veteran Waivers & Home Improvement Incentives

These programs do not replace a Residential Builder license. They can, however, reduce licensing cost for eligible veterans, create contractor opportunities or help homeowners fund qualifying work.

Veteran initial-license fee waiver

Michigan’s current builder application provides an initial-license fee waiver for a qualifying veteran who submits acceptable separation documentation showing the required character of service.

After opening the military page

  1. Read the veteran eligibility.
  2. Prepare the required DD-214/DD-215 or accepted documentation.
  3. Attach it to the current license application.
  4. Do not pay the standard initial fee when LARA confirms the statutory waiver applies.

Military 60-hour education waiver

Qualifying construction experience gained in the Armed Forces can support a full or partial prelicense-education waiver.

  • Prepare military service documentation.
  • Prepare the required signed statement/affidavit from a commanding officer, supervisor or military superior with direct knowledge of the construction competency.
  • Submit it through the current LARA application process.
Important exam consequence: LARA’s military-builder guidance says a military-exempt applicant who fails the first licensing examination on the first attempt cannot simply keep relying on the education waiver; the applicant must complete the approved 60-hour prelicense education before retaking.

Michigan Home Energy Rebates (MiHER)

Michigan’s EGLE Home Energy Rebate programs can help eligible households pay for approved energy-efficiency and electrification improvements.

  • Eligible rebate work must be performed by an approved MiHER Registered Contractor.
  • Qualifying measures can include insulation, air sealing, heat pumps, water heating, electrical improvements and other approved measures.
  • Income level and program caps determine the benefit.
  • New construction is not eligible for MiHER home rebates.
  • Funding/application availability changes by district and program conditions.
Current availability warning: EGLE’s current 2026 program information should be checked immediately before promising a homeowner assistance. Temporary application suspensions have affected specific districts, including Detroit and Warren.

Resident support: 855-510-7080.

MiHER contractor incentives

Michigan separately publishes incentives for participating MiHER contractors, including incentives tied to qualifying disadvantaged-community projects and certain electrification measures.

State builder license ≠ MiHER registration. A Michigan Residential Builder or M&A credential does not automatically make the business an approved MiHER Registered Contractor.

MiHER regional funding context

EGLE publishes regional program allocations. These figures are program funding allocations—not guaranteed awards to any homeowner or contractor.

Michigan district Published regional allocation
Bay City$16,640,898.55
Cadillac$12,953,710.79
Detroit$26,138,495.59
Lansing$18,094,487.96
Gaylord$12,899,664.53
Grand Rapids$16,824,749.70
Jackson$14,317,273.53
Kalamazoo$16,372,499.75
Marquette$13,209,077.19
Warren$18,931,747.69

Weatherization Assistance Program

Michigan’s federally funded Weatherization Assistance Program helps qualifying low-income households with energy-conservation and related health/safety improvements. Local Community Action Agencies administer services around Michigan.

Homeowner action: open the official Weatherization page → find the local operator serving your county → complete the program’s eligibility process → do not independently hire a contractor and assume the work will later be reimbursed.

State Emergency Relief — energy-related home repairs

Michigan MDHHS also identifies qualifying energy-related home repairs under State Emergency Relief. Current state guidance lists a $4,000 lifetime household limit for state energy-related home repairs, subject to program eligibility and current policy.

Homeowner action: open Energy & Weatherization Assistance → review State Emergency Relief repair eligibility → use MI Bridges/current MDHHS application route → wait for program authorization before assuming a repair is covered.
Who to call

Michigan Builder Licensing Phone Numbers, Emails, Address & Google Map

Your question Office Current contact Have this ready
Residential Builder / M&A licensing BCC Licensing Section 517-241-9316
LARA-BCC-Licensing@michigan.gov
License/application number, exact credential type, applicant/legal name.
Complaint / licensing enforcement BCC Enforcement 517-241-9309
LARA-BCC-Compliance@michigan.gov
License number, job address, dates, complaint evidence.
State building permit BCC Permit / Building Trades 517-241-9313
bccpermits@michigan.gov
Exact property municipality and permit/project type.
PSI exam scheduling PSI 855-579-4635 Candidate identity and LARA testing authorization.
Accela technical issue BCC online-service support LARA-BCC-Service@Michigan.gov Account email, license number and screenshot/error details without exposing unnecessary sensitive data.

BCC / Residential Builders Board government location

Michigan Department of Licensing and Regulatory Affairs
Bureau of Construction Codes
Ottawa Building
611 W. Ottawa Street
Lansing, MI 48933

Do not assume this is a walk-in licensing counter. This is the BCC/Board government and meeting location. Builder applications, renewals and correspondence use Accela or designated mailing routes. Call before traveling.

Licensing mail

Mail with payment

Bureau of Construction Codes
Licensing Section
P.O. Box 30255
Lansing, MI 48909

Mail without payment

Bureau of Construction Codes
Licensing Section
P.O. Box 30254
Lansing, MI 48909

LARA currently lists Licensing Section phone availability as 9:00 a.m.–4:00 p.m., Monday through Friday, excluding state holidays.

Frequently asked questions

Michigan Residential Builder License Lookup FAQs

Where is the official Michigan Residential Builder license lookup?

The official Residential Builder and Maintenance & Alteration license search is LARA Bureau of Construction Codes’ Accela Citizen Access Search for Licensee. Search by license number when possible and compare the government record with the person or company named in the construction contract.

Does Michigan use MiPLUS for Residential Builder licensing?

The normal Residential Builder/M&A licensing platform is Accela Citizen Access. LARA states that Residential Builders transitioned to Accela in August 2019. MiPLUS is used for many other Michigan professions, which is why generic search results can send builder applicants to the wrong starting portal.

At what project amount does a Michigan residential contractor generally need a license?

Michigan LARA’s homeowner guidance states that contractors offering residential work totaling $600 or more in labor and materials generally must be licensed, subject to statutory exemptions. A larger project should not be divided into smaller contracts merely to evade licensing requirements.

What is the difference between a Residential Builder and an M&A Contractor?

An Individual Residential Builder can construct a complete residential structure and perform maintenance and alteration work within applicable law. An M&A Contractor is limited to the specific approved trades shown on the license.

Do I need to verify a builder company separately?

Yes when the company is the contracting entity. Michigan has separate Residential Builder Company and M&A Company credentials, and a builder company must maintain an appropriately licensed qualifying officer.

How many hours of prelicense education does Michigan require?

A new Individual Residential Builder or M&A applicant normally completes 60 hours of LARA-approved prelicense education before licensing/testing unless LARA approves an applicable armed-forces education waiver.

How much is the Michigan Residential Builder application fee?

The current July 2026 BCC-2000 application lists a $195 initial fee for an Individual Residential Builder and a $195 initial fee for an Individual M&A Contractor. Qualified veterans may receive the applicable initial-license fee waiver.

Can an LLC be entered on the individual builder application?

No. The current individual application is for the individual licensee. Michigan provides a separate company-license application after an appropriately licensed qualifying officer exists.

How long is Michigan builder application processing?

LARA’s current Licensing Section warns that processing can take up to approximately 3–5 weeks and that applications are reviewed in the order received. An incomplete or deficient submission can take longer.

Do I schedule PSI before applying to LARA?

No for an Individual Residential Builder or M&A applicant. Submit the state licensing application first. After LARA approves the candidate to test, the Department sends eligibility information to PSI.

How much is the Michigan Residential Builder PSI exam?

The PSI handbook currently linked by LARA lists the combined Residential Builder Practice/Trade and Business/Law examination at $117 for the initial attempt and retest.

What is the Michigan Residential Builder exam format?

The current LARA-linked PSI handbook lists 160 questions, a raw passing score of 116 and a 240-minute time limit for the combined Residential Builder examination. The handbook describes the builder examination as closed book.

Can I take the Michigan Residential Builder exam online from home?

BCC’s current PSI page specifically identifies remote online testing for Plumbing Contractor and Master Plumber examinations. Residential Builder applicants should use the testing-center scheduling options PSI makes available rather than assuming remote testing is authorized.

How often does a Michigan Residential Builder license renew?

Michigan Residential Builder and M&A credentials generally renew every three years by May 31, but individual licenses do not all expire in the same year. Check the live LARA record for the exact expiration date.

How much is Michigan builder renewal?

The current renewal fee is $150. LARA lists a $20 late fee after expiration and a $35 late fee after the renewal becomes more than 60 days late.

How much continuing education does a Michigan builder need?

Current LARA guidance requires 21 hours during the first or second renewal cycle and 3 hours for the third or later renewal cycle, subject to the detailed continuing-competency rules applicable to that individual license.

Does a Michigan builder license automatically cover building permits?

No. The state builder license and project permits are separate. Use Michigan’s Statewide Jurisdiction List to determine whether BCC, a county, city, village or township handles building, electrical, mechanical and plumbing permits for the property.

How long do I have to file a Michigan Residential Builder complaint?

The current April 2026 BCC complaint form generally requires a residential-building complaint to reach the Department within 18 months after the applicable latest completion, occupancy or purchase event. When a project requires an occupancy permit, the relevant event can include the latest temporary certificate of occupancy, final certificate of occupancy or closing.

Can BCC make a builder refund my money?

No. BCC’s complaint instructions state that the Bureau does not act as a civil court, cannot order a refund or cancel a contract and cannot provide legal advice. Regulatory enforcement and private civil remedies are separate.

Does Michigan still have a Homeowner Construction Lien Recovery Fund?

No. Michigan LARA states that the Homeowner Construction Lien Recovery Fund was abolished in August 2010.

Can a veteran get Michigan builder licensing benefits?

Yes in qualifying circumstances. Michigan provides an initial-license fee waiver for eligible veterans and can approve full or partial 60-hour prelicense education credit based on qualifying Armed Forces construction experience and required supporting documentation.

Are there Michigan rebates for home improvement projects?

Michigan EGLE administers Home Energy Rebate programs for qualifying existing-home efficiency and electrification projects, subject to eligibility, program caps and current funding availability. Eligible rebate work must be performed by an approved MiHER Registered Contractor, and new construction is not eligible.

Freshness control

Official Michigan Sources Used to Build This Guide

  • LARA Bureau of Construction Codes Residential Builders licensing page.
  • LARA Accela Citizen Access public licensee search.
  • Current BCC-2000 Individual Residential Builder/M&A application, July 2026.
  • Current BCC-2030 Residential Builder/M&A Company application.
  • LARA 2026–2029 approved prelicense/continuing-education course list.
  • LARA PSI Examinations instructions.
  • PSI Residential Builder/M&A examination handbook currently linked by LARA.
  • LARA License/Registration Renewals guidance.
  • LARA Continuing Competency requirements.
  • BCC-ES-100 Statement of Complaint, April 2026.
  • BCC Enforcement Section.
  • BCC Building Permit Information.
  • Michigan Statewide Jurisdiction List.
  • LARA homeowner hiring guidance.
  • LARA military/veteran Residential Builder resources.
  • Detroit BSEED.
  • Grand Rapids Development Center.
  • Flint Building & Safety Inspections.
  • Ann Arbor official city contacts.
  • Lansing permit portal.
  • Michigan EGLE Home Energy Rebates.
  • Michigan MDHHS Weatherization and State Emergency Relief resources.
Freshness rule: course approvals, exam locations, local permit processes, incentive funding and government forms change. Use the linked official page as the final check immediately before paying, filing, traveling or promising a benefit to a customer.
Full source / regulatory review: August 31, 2026

For a Michigan Builder, Verify the License and the Project

Homeowner: search the live LARA record, match the person/company, verify M&A scope or qualifying officer where applicable, identify the permit authority, and put permits, insurance, materials, payments and change orders in writing.

Applicant: complete the approved 60-hour education, submit the current BCC-2000 application, wait for LARA authorization, schedule PSI, complete the examination within the application window and confirm issuance through Accela.

ContractorsBoard.org provides independent educational and government-navigation information. It does not issue, renew, verify, suspend or discipline Michigan builder licenses, perform construction inspections, issue permits or adjudicate complaints.