Florida Contractor License Lookup: DBPR Search, Status & Complaints

Florida DBPR contractor verification · permits · complaints · money protection

Florida Contractor License Lookup: Verify the License, Business, Permit and Money Trail

Florida’s official DBPR Verify a Licensee search is the starting point—not the entire hiring check. A useful verification confirms the contractor’s exact credential, Certified vs Registered authority, business being qualified, scope of work, public complaints and local project permit.

This guide also covers Florida-specific protections that a generic license-lookup article misses: the >10% initial-payment permit/start rule, Notice of Commencement, construction liens, emergency roofing contracts, Recovery Fund claims, My Safe Florida Home grants and city/county permit systems.

Independent resource: ContractorsBoard.org is not DBPR, CILB, a Florida county/city licensing office, a contractor, insurer, surety company, recovery-fund administrator or referral service. Never treat an interactive helper on this page as an official license verification.

The 60-Second Florida Contractor Check

Use the state database first. DBPR currently lets you search a licensee by Name, License Number, City or County, or License Type. A license-number search is normally the cleanest identity check when you already have the contractor’s number.

Best identity search License number
Statewide Certified
Local authority Registered
Typical CILB CE 14 hours
Consumer grant MSFH up to $10K
Do not stop at “Current, Active.” Florida licenses are classification-specific. A contractor also must be operating through the appropriate qualified business, and a Registered contractor may be geographically limited.
August 31, 2026 renewal alert: Certified CILB construction licenses use an August 31 even-year renewal cycle. If you are checking a contractor around this date, refresh the live DBPR record shortly before signing, permitting or paying because a renewal status can change.
Official live lookup

Florida DBPR License Search: Exactly What to Do After the Page Opens

Do not use Google search snippets as proof of current licensure. Open the state database and inspect the detail record yourself.

DBPR license-number search micro-guide

  1. After the page opens, select Search by License Number.
  2. Copy the contractor number directly from the written estimate, contract or permit information.
  3. Submit the search.
  4. Open the exact Licensee Details result.
  5. Read the License Type and Rank. “Contractor” alone is not enough.
  6. Read the complete current Status.
  7. Check the expiration date.
  8. Check whether the record is Certified or Registered.
  9. Compare the primary name / DBA / qualified business with the contract and payment recipient.
  10. Read any available business-qualification or related-license information.
  11. Open available complaint information.
  12. Save a dated copy or screenshot for the project file.
  13. Next, open the local permit system serving the property address.
Stop condition: if the license type, business name, geographic authority or current status does not match what the salesperson represented, resolve that discrepancy before signing.
Why exact-number search is stronger: several contractors can have similar personal or business names. A number narrows identity, but you still must make sure the person/company using that number actually corresponds to the record.
Result interpretation

How to Read a Florida DBPR Contractor Record

Field What to verify Why it matters Next action
License type / rank General, Building, Residential, Roofing, Plumbing, AC, etc. The scope differs by category. Compare to the project’s actual trades.
Status Current DBPR status. A record can exist without current contracting authority. Recheck immediately before signing if renewal/expiration is near.
Expiration Expiration date. A long project can extend past the current cycle. Recheck during a delayed project.
Certified / Registered State certification or local registration route. Registered authority is jurisdiction dependent. For Registered, verify the local competency jurisdiction.
Primary name / DBA Matches contracting entity and payee. License-number misuse and entity switching create identity risk. Ask for explanation before paying a different entity.
Qualified business Business is properly connected to the qualifier. Florida construction businesses operate through qualifying agents. Match with contract, permit and invoice.
Public complaints Available complaint detail and disposition. Complaint existence alone does not explain outcome. Read the complaint status/disposition rather than count only.
Complaint status is not license status. DBPR’s public complaint pages warn that the status displayed for a complaint describes the complaint case. Return to the Licensee Details record for the actual license status.

Independent Florida Contractor Record Checker

Complete this only after viewing official state/local records. No government database is queried by this tool.

Complete all fields using official records.
Identity layer

Verify the Qualifying Individual and the Business Taking Your Money

Florida licenses individuals who qualify construction businesses. Do not assume every LLC/corporation bearing a similar name is automatically covered by an individual’s contractor credential.

Identify the licensed qualifier

Start from the individual contractor credential and associated qualified-business information.

Read the written contracting party

Look at the exact legal entity named as contractor—not the logo at the top of the estimate.

Compare the permit applicant

When a permit exists, compare the contractor/qualifier shown there with DBPR and the contract.

Compare the requested payee

Resolve a request to pay an unrelated individual, second company, cash-only account or different entity before sending money.

Florida-specific jurisdiction rule

Certified vs Registered Florida Contractors

Certified license

DBPR describes Certified licenses as statewide. A certified contractor can work anywhere in Florida within the scope of that certification, subject to project permits, business qualification and other applicable requirements.

Still check: classification, current status, business/qualifier, permit and separately regulated trades.

Registered license

DBPR describes Registered licenses as limited to local jurisdictions where the contractor holds the applicable certificate of competency.

Extra check: contact/search the contractor-licensing authority serving the project location and confirm the local competency authority.

Florida law contains special emergency provisions that can affect certain registered contractors during declared natural emergencies. Treat those as narrow statutory exceptions—not proof that a Registered license is ordinarily statewide.

Certified/Registered application page: what to do after opening it

  1. Read the explanation directly above the license categories.
  2. Choose Certified Licenses for the statewide route.
  3. Choose Registered Licenses only when your route is based on local competency.
  4. Select the exact trade/category.
  5. Then select the exact transaction: examination, initial issuance, qualifying business, additional business, endorsement, reciprocity or status change.
Current statutory scope

General, Building and Residential Contractor Licenses Are Not the Same

Florida category High-value scope rule Consumer implication
General Contractor Florida defines General Contractor authority broadly as unlimited as to the type of construction that may be performed under Part I, subject to statutory limitations including separately regulated trade rules. Broad authority does not mean every specialty trade may always be self-performed without the required separate credential.
Building Contractor Commercial/residential buildings generally not exceeding three stories and accessory-use structures; also remodeling/repair/improvement of buildings of any size when the work does not affect structural members, within statutory scope. Do not assume CBC and CGC authority are identical on complex structural/high-rise work.
Residential Contractor Construction/remodeling/repair of one-, two- or three-family residences generally not exceeding two habitable stories above no more than one uninhabitable story and related accessory structures. Do not use a residential credential as proof of unrestricted commercial authority.

General Contractors Still Face Separately Licensed Trade Rules

Florida Statutes §489.113 contains an important limitation that generic contractor guides often miss. General, Building and Residential contractors generally must subcontract specified regulated trade work unless they also hold the necessary state certificate/registration or another statutory exception applies.

Electrical

Verify through Florida’s separate Electrical Contractors’ Licensing Board route.

Plumbing

Check the applicable CILB plumbing contractor credential.

Mechanical / AC

Check the appropriate Mechanical or Air Conditioning contractor category.

Roofing

Check roofing authority and Florida’s additional residential roof-contract rules.

Swimming pool

Pool/spa construction can require its own state contractor category.

Sheet metal

Separately regulated scope can apply.

Other specialty work

Fire, asbestos, alarms and other regulated work can involve other boards/agencies.

Permit-name check: for a multi-trade project, do not verify only the prime contractor. Review the trade subcontractors shown on permit records when your jurisdiction publishes them.
Florida-specific payment protection

If a Florida Contractor Takes More Than 10% Up Front, Know the 30/90-Day Rule

Florida Statutes §489.126 creates a practical protection for residential property owners when a contractor receives an initial payment totaling more than 10% of the contract price.

More than 10% received

The statutory timing framework applies when the initial payment exceeds 10% of the residential contract price.

30 days to apply for permits

The contractor must apply for required permits within 30 days after the payment, unless no permit is required, just cause applies or the owner agreed in writing to a longer period.

90 days to start

The contractor must start work within 90 days after all required permits are issued, subject to statutory just-cause/written-extension provisions.

This rule applies to the statute’s definition of contractor without regard to whether the person was licensed. Do not assume an unlicensed person can avoid the payment statute simply because no valid DBPR license exists.

If the contractor missed the permit/start deadline: practical statutory demand route

  1. Confirm how much of the total contract price was paid initially.
  2. Confirm whether a permit actually was required.
  3. Search the local permit system for an application/issued permit.
  4. Document the payment date, permit date and whether work started.
  5. Read the current statute before sending a demand.
  6. If the statutory conditions are met, the law describes a written demand sent by certified mail, return receipt requested.
  7. Send it to the contractor address in the written agreement; if none exists, use the licensing address identified by the statute.
  8. Demand the applicable action: apply for necessary permits, start work or refund the payment.
  9. Keep the letter, postal receipt, delivery confirmation, contract and payment evidence together.
  10. For substantial losses or possible fraud, also consider DBPR complaint, local law enforcement and qualified legal advice because administrative/civil/criminal remedies are separate.
Florida law further addresses contractors who received money exceeding the value of work performed and then fail/refuse to perform work for a 90-day period or another contractually specified period. Read the entire current statute when that is your situation.
Do not mix these numbers

Four Florida Construction Dollar Rules With Completely Different Meanings

>10% Initial residential payment can trigger the §489.126 permit/start timing framework.
>$2,500 Covered residential direct contracts require the statutory Construction Lien Law notice.
>$2,500 Covered residential construction agreements generally must contain the Homeowners’ Construction Recovery Fund notice.
>$5,000 For a building permit, current lien law requires the permitting authority to receive specified Notice of Commencement recording information/copy before the first inspection.
These thresholds do not mean “jobs below $2,500 or $5,000 do not need contractor licenses or permits.” They control different notices/payment procedures.
Construction lien protection

Florida Notice of Commencement, Notice to Owner and Lien Releases

One of the biggest homeowner risks is paying the prime contractor while a subcontractor or supplier remains unpaid. Florida’s Construction Lien Law creates notices and release procedures to manage that risk.

Direct contract over $2,500: find the lien warning

Florida Statutes §713.015 requires covered direct contracts greater than $2,500 for improvements to one- through four-family dwellings to contain a prominent Construction Lien Law notice.

The warning explains that unpaid subcontractors, sub-subcontractors or suppliers can potentially enforce lien rights against the property even if the homeowner already paid the contractor.

Notice of Commencement

What to do with the NOC instead of just signing it

  1. Get the legal property description, owner name and exact contractor legal name correct before recording.
  2. Compare the contractor named in the NOC with the contract and DBPR license/business record.
  3. Record the NOC with the clerk/recording authority as applicable.
  4. Post the required recorded/certified documentation at the jobsite.
  5. For a direct contract over $5,000, make sure the building-permit authority receives the recording information/copy required before the first inspection.
  6. Do not let the project continue for months under an expired NOC without understanding the lien consequences.
  7. If changing contractors, ask the clerk/building department or legal counsel what termination/new NOC procedure applies rather than simply crossing out the old contractor.

When a Notice to Owner arrives

Do not throw it away

A Notice to Owner is generally not itself a lien. It tells you a subcontractor/supplier is preserving potential payment rights.

Add the sender to your payment checklist

Track who supplied labor/materials and which draw should pay them.

Request proper lien releases

Before making the corresponding progress/final payment, obtain appropriate releases from parties whose potential claims matter.

Verify final permit closeout

Combine permit closeout, final inspection/CO/Completion where applicable, lien releases and punch-list completion before final payment.

Storm / insurance-claim protection

Florida Roofing Contracts Have Extra Insurance-Claim Rules

Florida Statutes §489.147 imposes special requirements and prohibited practices for contractors involved with residential roof repairs/replacements and property-insurance claims.

No deductible waiver/rebate scheme

A contractor cannot lawfully use prohibited deductible-waiver/rebate practices to induce an insurance-funded roof job.

Contractor ≠ public adjuster

A contractor cannot interpret policy provisions or adjust a property insurance claim for the insured unless separately licensed to perform that role.

Detailed good-faith estimate

Insurance-related repair agreements must comply with the statute’s estimate requirements rather than simply authorizing open-ended repair work.

Required roof notices

Residential roof contracts must contain statutory notices. Failure to include one required prohibited-practice notice can give the homeowner a 10-day voiding right.

Roof contract after a declared emergency

For qualifying residential roof contracts entered into within 180 days of events covered by a Governor-declared state of emergency and within the declared geographic area, §489.147 provides a cancellation right without penalty generally within 10 days after contract execution or by the statutory “official start date,” whichever comes first.

Storm-roof contractor checklist

  1. Verify the roofing contractor’s DBPR credential.
  2. Check the business/entity collecting payment.
  3. Read every insurance-claim and deductible clause.
  4. Do not sign an assignment/authorization you do not understand.
  5. Contact your insurer yourself to verify coverage, deductible and policy terms before relying on contractor statements.
  6. If a declared emergency is involved, read the current statutory cancellation language and dates before the official-start event occurs.
  7. Search the roof permit separately.
  8. Verify required inspections/final status before releasing final payment.
Owner-builder warning

Florida Owner-Builder Exemption Does Not Mean “Put an Unlicensed Contractor Under My Permit”

Florida has statutory owner-builder exemptions under specific conditions. They place responsibilities on the owner and do not create a general route for an unlicensed contractor to operate behind an owner’s permit.

If someone tells you, “You pull the permit as owner-builder and I will do everything,” verify the arrangement with the building department before proceeding. Local agencies publish owner-builder disclosures because the legal responsibilities shift to the owner.
Applicant action center

Florida Certified Contractor Application: Pick the Transaction Before You Fill Anything Out

DBPR’s Construction Application Center is a routing menu. Selecting the wrong transaction can create unnecessary forms, fees and delays.

Common CILB route What it is for Do not use it for
CILB 1 Initial / retake certified contractor examination route where applicable. Final issuance after you already passed.
CILB 5-A Certified contractor initial license as an individual for applicable category/transaction. Qualifying a business when the business-specific form is required.
CILB 6-A Certified contractor qualifying a business; a common route for CGC applicants after required examination. Assuming the examination application automatically qualifies the corporation/LLC.
CILB 7-A / related Additional business-qualification transaction where applicable. Filing another original individual license unnecessarily.
CILB 10 Certification by Endorsement, including qualifying out-of-state/NASCLA routes. Assuming NASCLA alone grants Florida authority.
CILB 32 Certification by Reciprocity where an applicable Florida agreement exists. Using “reciprocity” for any state license with no agreement.

DBPR Application Center: exact workflow

  1. Select Certified Licenses or Registered Licenses.
  2. Select the exact category: General, Building, Residential, Roofing, Plumbing, AC, Mechanical, Pool/Spa, Solar, etc.
  3. Review all available transactions before clicking one.
  4. If examination is needed, open the current initial/retake examination checklist.
  5. If exams are already passed, choose the correct initial-licensure/business-qualification transaction.
  6. Open both Online Services and/or the Printable Application instructions where offered.
  7. Read the complete supporting-document checklist before paying.
  8. Prepare experience, electronic fingerprints, credit reports, business documents and insurance/WC attestations that apply.
  9. Save a complete copy of the application and attachments.
  10. Track the application through DBPR rather than resubmitting documents simply because processing takes time.
  11. Verify final issued license through the public DBPR lookup before contracting.
A passed examination does not itself authorize contracting. DBPR’s current application materials also warn applicants to meet licensure requirements and complete the post-exam licensing transaction.
Current exam logistics

Florida Contractor Exams: PTI, Pearson VUE and 2026 Reference Lists

Florida DBPR’s current Construction Examinations page identifies Professional Testing, Inc. (PTI) for registration/development/scoring functions and Pearson VUE for scheduling computer-based examinations after approval.

PTI

407-264-0562

Use the vendor identified on DBPR’s current exam page rather than an exam-prep school’s registration link.

Pearson VUE

888-204-6230

Scheduling for applicable computer-based CILB examinations after eligibility/authorization.

Exam format

DBPR describes the construction exams as open-book multiple-choice. Use only approved/current references.

Division I exam structure

Florida’s exam overview identifies the core Division I General, Building and Residential examination structure as:

  • Business & Finance.
  • Contract Administration.
  • Project Management.
Older “Exam at a Glance” PDFs can contain outdated paper/pencil logistics even when their exam-component descriptions remain useful. For current scheduling/location rules, use the live DBPR Construction Examinations page.

2026 plumbing examination dates

DBPR’s current exam page identifies plumbing trade-knowledge as the remaining paper/pencil construction trade exam and lists 2026 sessions at Osceola Heritage Park Exhibition Building in Kissimmee:

2026 plumbing session Location
April 14–15, 2026 Kissimmee
June 2–3, 2026 Kissimmee
August 11–12, 2026 Kissimmee
October 12–13, 2026 Kissimmee
December 8–9, 2026 Kissimmee

Study-reference micro-guide

  1. Open the DBPR reference-list page.
  2. Select the exact trade/classification.
  3. Confirm the page says the references are effective for the current exam period.
  4. Make a checklist of every approved book/reference and edition.
  5. Do not buy a used reference simply because its title matches; edition matters.
  6. Read DBPR/PTI candidate instructions on highlighting/tabbing/reference use before modifying books.
  7. After DBPR/PTI authorization, schedule through the current identified test administrator.
Applicant financial responsibility

Florida Contractor Credit: The 660 FICO Rule and What Happens Below It

660 or higher

CILB’s current financial-responsibility guidance uses a 660 or higher FICO-derived credit score as part of the board’s financial responsibility/stability standard, along with treatment of liens and judgments.

Below 660

The applicant must complete a board-approved 14-hour Financial Responsibility and Stability course.

Do not order a bare consumer credit score

  • Prepare a personal credit report meeting CILB requirements.
  • If qualifying a business, prepare the required business credit report.
  • The report must search applicable local, state and federal records for liens/judgments.
  • Address unsatisfied liens/judgments with the documents required by the application.
  • Use the current application checklist to confirm report age/format requirements.

Financial Responsibility PDF: what to do after opening it

  1. Locate the 660 score requirement.
  2. Review the public-record search requirements.
  3. Check personal and business report requirements separately.
  4. If the score is below 660, use DBPR’s approved-course system to locate the required 14-hour course.
  5. Resolve lien/judgment documentation before sending the complete license package.
CILB’s FAQ does not impose a generic minimum net-worth figure for this ordinary construction-contractor financial-responsibility pathway. Do not copy an unrelated electrical-contractor or other profession’s net-worth requirement into a CILB contractor application.
License maintenance

Florida Contractor Liability Insurance and Workers’ Compensation

Category Current CILB FAQ minimum Hiring/application check
General / Building $300,000 liability and $50,000 property damage. Current certificate matching the qualified business.
Other CILB categories Generally $100,000 liability and $25,000 property damage or another amount set by applicable board rule. Verify exact category requirements.
Workers’ compensation Coverage or legally applicable exemption. Compare actual workforce/entity circumstances with policy/exemption.
DBPR’s CILB materials state that an applicant planning to use a workers’ compensation exemption can follow the applicable exemption process after license issuance within the time allowed by the current application instructions. Follow the live checklist rather than assuming an exemption applies automatically.
Out-of-state applicants

Florida Reciprocity, 10-Year Endorsement and NASCLA Are Different Routes

Formal reciprocity — CILB 32

Florida currently publishes reciprocal construction agreements for qualifying General/Building/Residential applicants involving Louisiana, Mississippi and North Carolina.

Certification by Endorsement — CILB 10

Used for qualifying substantially equivalent out-of-state exam/license routes and the approved NASCLA path.

10-year endorsement route

Florida law also provides an endorsement mechanism for qualifying applicants who have held a valid current similar out-of-state credential for the required period and satisfy the other conditions.

NASCLA is not a Florida contractor license. For qualifying General/Building/Residential applicants, NASCLA can be used within Florida’s endorsement process. Florida still requires the remaining application, qualification, financial, fingerprint, insurance and examination/code requirements that apply to that route.

Out-of-state route selector

  1. Do not begin with the state you live in; begin with the Florida classification you want.
  2. Check whether an exact formal reciprocal agreement applies.
  3. If yes, read CILB 32 and identify state license verification / Florida examination requirements.
  4. If no, open CILB 10.
  5. Read Option A/B/C carefully and identify whether you are using exam equivalency, license equivalency, NASCLA or the long-term licensure route.
  6. Collect official license verification and disciplinary history from the source jurisdiction when required.
  7. Complete Florida-specific Business & Finance / Building Code requirements that apply.
  8. Do not contract in Florida until DBPR issues the Florida credential.
Pending application

Check Florida Contractor Application Status Before Sending Duplicate Documents

  1. Select the applicable construction board/profession.
  2. Enter the identifying information required by the secure DBPR form.
  3. Open the pending application.
  4. Read each deficiency/request precisely.
  5. Identify whether the issue concerns exam, experience, fingerprints, credit, business documents, fee or insurance.
  6. If you already submitted the item, verify whether it has been received/processed before sending another sensitive document.
  7. If the online status does not explain the next step, call DBPR at 850-487-1395.
“Application approved,” “exam passed” or “documents received” should never be published as if they are the final contractor credential. Check the public Verify a Licensee database for issued status.
Current renewal

Florida Contractor Renewal: Certified vs Registered Cycles and CE

Certified

Current DBPR construction information places Certified contractor expiration on August 31 of every even-numbered year.

Registered

Registered construction contractors use August 31 of every odd-numbered year.

August 31, 2026: this is the published certified-contractor renewal date for the current even-year cycle. Contractors and homeowners should verify the live status rather than assume a renewal submitted near the deadline has already posted.

Typical 14-hour CILB CE package

  • 1 hour specialized/advanced Florida Building Code.
  • 1 hour Workplace Safety.
  • 1 hour Business Practices.
  • 1 hour Workers’ Compensation.
  • 1 hour Florida Laws and Rules.
  • Remaining approved construction-related hours.

Category-specific hours

License group Additional subject to check
General / Building / Residential Current DBPR table includes wind-mitigation and cementitious-cladding/stucco/plaster/lath subject requirements within the 14 hours.
Roofing Current DBPR table includes wind-mitigation education.
Pool/Spa Current DBPR table includes the applicable pool-electrical education requirement.
Newly licensed contractors can have reduced/zero CE for the first renewal depending on how long the license was held during the cycle. DBPR’s FAQ describes no CE when licensed less than 12 months before the renewal deadline and seven general hours for certain licensees held more than one but less than two years. Recheck the current FAQ for your issuance date.

Approved-course search: what to do

  1. Open the CILB renewal table first.
  2. Write down every required subject for your exact license category.
  3. Open the CE Course Search.
  4. Select Construction Industry Licensing Board.
  5. Search for approved courses matching each required subject.
  6. Confirm provider/course approval before paying.
  7. After completion, review the CE record in your DBPR account before final renewal submission.
Regulatory complaint

Florida DBPR Contractor Complaint: Build the Evidence Before Filing

DBPR investigates conduct within its administrative licensing authority. The agency does not become your civil attorney and does not guarantee repayment of contract damages.

Prepare these records

  • Full signed contract.
  • All change orders.
  • Proof of deposits/progress payments.
  • Invoices and receipts.
  • DBPR license-detail record.
  • Permit/application record.
  • Inspection failures/corrections.
  • Dated photos/videos.
  • Texts and emails.
  • Advertisements / license representations.
  • Notices to Owner / lien records.
  • Written demand/refund requests.
  • Simple chronological timeline.

What to do after DBPR Complaint Center opens

  1. Read DBPR’s explanation of what its regulatory process can and cannot do.
  2. Determine whether the complaint concerns a licensed contractor or unlicensed activity.
  3. Choose the applicable online/form route.
  4. Identify the contractor by exact license number and qualified business.
  5. Write factual allegations with dates and dollar amounts.
  6. Attach the strongest relevant evidence rather than a large unsorted file dump.
  7. Save the submission confirmation and entire packet.
  8. Continue tracking construction-lien, court, insurance, bond and contractual deadlines separately.
Public complaint limitation: DBPR warns that not every complaint can be displayed publicly because some information is confidential or otherwise restricted. “No complaints displayed” is not the same statement as “no dispute has ever existed.”
Separate official database

Search and Report Florida Unlicensed Contractor Activity

DBPR maintains a separate public complaint search for people/businesses reported for activity while not licensed by DBPR.

Unlicensed Activity Search: exact workflow

  1. Search by person/business name.
  2. Add first initial where useful.
  3. Use the county filter only as a secondary filter.
  4. Remember that the county result relates to address-of-record filtering and can miss someone working in your county but based elsewhere.
  5. Review available complaint details.
  6. If activity is occurring now, open Report Unlicensed Activity.
  7. Select the region/profession in DBPR’s reporting workflow.
  8. Enter the project location and factual description.
  9. Add useful photographs where allowed.
  10. Submit or call 866-532-1440.

DBPR

2601 Blair Stone Road
Tallahassee, FL 32399

Florida warns that email addresses submitted to state agencies can become public records. Use the reporting method appropriate for your privacy concerns.

Florida Contractor Problem Router

Choose both answers.
Homeowner last-resort remedy

Florida Homeowners’ Construction Recovery Fund: Who It Is Actually For

Florida’s Recovery Fund is not an automatic refund after a DBPR complaint. DBPR describes it as a fund of last resort for qualifying homeowners harmed by specified misconduct/financial mismanagement of a properly licensed contractor after required civil remedies and claim prerequisites have been satisfied.

Division I

For eligible claims involving contracts entered into on or after July 1, 2024, DBPR currently identifies a maximum statutory claim amount of up to $100,000, subject to actual eligible loss and other limits.

Division II

For eligible claims involving contracts entered into on or after July 1, 2024, DBPR currently identifies a maximum of up to $30,000, subject to actual eligible loss and other limits.

The maximum is not a guaranteed award. Eligible actual damages, underlying orders/awards, contractor aggregate limits, fund rules and appropriations can reduce or prevent payment.

Current Recovery Fund claim form: threshold questions

  • Are you a qualifying homeowner/claimant?
  • Was the contractor licensed and valid/current when the violation occurred as required by the fund law?
  • Was the transaction for construction/improvement of a qualifying Florida residence?
  • Do you have the required final court judgment, CILB restitution order or qualifying arbitration award?
  • Does the underlying finding involve a fund-eligible statutory violation?
  • Have required civil collection/asset-search remedies been exhausted/documented?
  • Is the claim within the Recovery Fund filing deadline?

Recovery Fund Claim Form: what to do after opening it

  1. Read the eligibility questions on the claim form before completing claimant information.
  2. Collect the entire signed construction contract and change orders.
  3. Collect the certified final court order/judgment and complaint, or the applicable CILB/arbitration order.
  4. Prepare evidence showing required efforts to collect the judgment/restitution amount.
  5. Prepare replacement/completion contractor agreements and payment proof.
  6. If work remains incomplete, gather the estimates/documentation specified by the current claim instructions.
  7. Collect permits, inspection records and Certificate of Occupancy/Completion where applicable.
  8. Collect liens, satisfactions and lien waivers/releases.
  9. Use the Recovery Fund’s asset-search instructions and correct affidavit based on claim amount.
  10. Call 850-921-6593 before mailing an incomplete package.

Recovery Fund office

2601 Blair Stone Road
Tallahassee, FL 32399-2215

Contract notice: Florida Statutes §489.1425 generally requires covered residential construction agreements to include the Homeowners’ Construction Recovery Fund notice unless labor and materials do not exceed $2,500.
Florida homeowner grant

My Safe Florida Home: Up to $10,000 and a Contractor Verification Requirement

As of the August 31, 2026 research review, the official My Safe Florida Home site displays free wind-mitigation inspections and grants of up to $10,000; the program’s current support center states that applications are being accepted. Funding and group availability can change quickly, so the participant portal controls.

Matching Grant

Current program guidance describes a $2 state contribution for each $1 contributed by the homeowner—reimbursement up to two-thirds of eligible project cost, with a maximum state contribution of $10,000 subject to available funding/appropriation.

Low-Income Grant

Eligible low-income homeowners can receive up to $10,000 without the ordinary matching contribution, subject to program rules, eligibility and available funds.

MSFH: exact program flow

  1. Select Create Your Account.
  2. In the secure Participant Portal, choose Sign Up Now.
  3. Enter email and request the verification code.
  4. Enter the Neighborly Software verification code and create the account/password.
  5. Complete the Prioritization Questionnaire.
  6. Follow the portal’s current inspection-group/grant-group instructions.
  7. If an initial inspection is required/available, complete it and wait for the report.
  8. Review only the Recommended Improvements.
  9. When grant application access is available, enter the selected contractor’s name, address, license number and email.
  10. Before entering the contractor, verify the license through Florida DBPR.
  11. Match the contractor classification to the recommended project.
  12. Do not start grant work until the program gives the required approval.
  13. Obtain/close required permits.
  14. After work, request the MSFH Final Inspection through the portal.
  15. Provide the final inspection report to the insurer and request applicable insurance discounts.
  16. Complete the Draw Request with invoices/payment/insurance/disbursement documentation required for your grant type.
No properly licensed contractor = no grant funding. MSFH’s current contractor-verification guidance says the homeowner is responsible for choosing a properly DBPR Certified or Registered contractor and for ensuring the Recommended Improvements are correctly performed.
Do not begin construction before approval. Starting mitigation work before the program’s required approval can make the work ineligible.

Current final-draw checklist

  • Confirm construction is complete.
  • Confirm applicable permits are approved/closed.
  • Request Final Inspection through portal.
  • Use the single Final Inspection opportunity carefully.
  • Send Final Inspection Report to insurer.
  • Submit contractor invoice.
  • Submit proof of payment when required for matching-grant reimbursement.
  • Submit insurer discount response/documentation.
  • Submit payment/disbursement information.
Current MSFH support guidance gives grant recipients 18 months from grant approval to complete construction and request the Final Inspection.

Department of Financial Services

200 East Gaines Street
Tallahassee, FL 32399-0317

Applicant financial benefits

Florida Contractor Licensing Fee Waivers for Military and Low-Income Applicants

Active/former military & spouse

DBPR has an initial licensing-fee waiver for qualifying active-duty/former military members and qualifying spouses/surviving spouses who provide required service/relationship documentation.

Veteran/spouse — within 60 months

DBPR’s veteran program can waive the initial license fee, initial application fee and initial unlicensed-activity fee for qualifying veteran/spouse applicants within 60 months of honorable discharge. Examination/incidental fees are excluded.

Low-income waiver

Applicants with qualifying household income at or below 130% of applicable federal poverty guidelines can request waiver of the initial licensing fee. Other application/exam/activity fees can remain due.

Military waiver: what to do

  1. Identify which military program fits your circumstances.
  2. Download the current military fee-waiver/service-verification form.
  3. Prepare military orders, DD-214, NGB-22, marriage certificate or DD-1300 as applicable.
  4. If using the within-60-month veteran/spouse waiver, verify the discharge/application timing.
  5. Attach the fee-waiver request to the licensing application instead of trying to recover the fee after payment.

Low-income waiver: what to do

  1. Use DBPR’s current income calculator/matrix to review potential eligibility.
  2. Open Form LI 001.
  3. Complete applicant/contact information.
  4. Select only the applicable eligibility option.
  5. Complete the required written declaration/signature.
  6. Attach the form to the contractor-license application.
  7. Budget for remaining application, examination or activity fees that are not waived.
Florida localization

Local Florida Contractor and Permit Lookup: State License Is Only Layer One

The permit jurisdiction is based on the project address. A Miami business working in Orlando needs Orlando-area permit compliance; a Registered contractor requires an additional local competency check.

Major Florida Permit Starting-Point Helper

Select an area.
Miami-Dade

Miami-Dade Contractor License, Complaints, Permits and Inspections

Herbert S. Saffir Permitting and Inspection Center
11805 SW 26 Street, Miami, FL 33175
Building / permitting information: 786-315-2000
Contractor Licensing: 786-315-2880

  1. Verify the contractor in statewide DBPR first.
  2. If county competency/local licensing is relevant, open Miami-Dade Contractor Inquiry.
  3. Search by local license number or company name.
  4. Review available county contractor/complaint information.
  5. Open Building Online Services.
  6. Search the project permit by address/permit information.
  7. Verify contractor information attached to the permit.
  8. Review inspection history and outstanding holds/corrections.
  9. Before final payment, verify final inspection and Certificate of Completion/Occupancy when applicable.
  10. Collect final lien releases from relevant parties.
Florida preemption has changed the status of various older local specialty contractor license categories. Do not rely on an old Miami-Dade competency-card article; use the current county/state search for the exact trade.
Broward County

Broward Contractor License Search: Use Name, CC Number or Company

Broward Building Code Division
2307 West Broward Blvd., Suite 300
Fort Lauderdale, FL 33312
954-765-4400
Broward County service line: 311

  1. Run the state DBPR search first.
  2. Open Broward’s contractor search.
  3. Choose one of three official search methods: contractor first/last name, CC Number, or company name.
  4. For a partial company search, Broward instructs users to use % around partial text—for example %Broward%.
  5. Open the matching local contractor record.
  6. Then open the permit search and enter the permit number/available access information.
  7. Use Broward 311 when you need a contractor complaint or permit-service route.
  8. If the property is in a Broward municipality rather than county permitting jurisdiction, verify that municipality’s requirements separately.
Palm Beach County

Palm Beach County Contractor Verification and Permit Closeout

Contractor Regulations
2300 N. Jog Road, 2nd Floor
West Palm Beach, FL 33411
561-233-5525
Permit Center: 561-233-5119
Permit Tracking: 561-233-5130

  1. Verify the Florida state credential.
  2. Open Palm Beach Contractor Regulations for county/local authorization where relevant.
  3. Use Search a Contractor’s Licenses.
  4. Use Search Applications/Permits/Inspections/Scheduling for the project.
  5. Confirm that a required permit actually was pulled.
  6. Review current inspection status.
  7. Do not make final payment until the permit is closed out.
  8. For suspected local unlicensed activity, file a Contractor Complaint or call 561-233-5525.
Palm Beach County warns that specific county construction-trade scopes were preempted by Florida law effective July 1, 2025. Use the current county page to determine whether a local Certificate of Competency still applies to the trade.
City of Orlando

Orlando: Contractor Registration, ProjectDox, NOC and Final Permit Status

Permitting Services Division
400 South Orange Avenue, 1st Floor
Orlando, FL 32801
407-246-2271
digitalpermits@orlando.gov

State-certified contractor registration

  1. Prepare the contractor’s current Florida DBPR certification.
  2. Prepare the current business tax receipt from the city/county where the business is located.
  3. Prepare workers’ compensation insurance or valid exemption.
  4. Orlando instructs that WC documentation be addressed to the City of Orlando, 400 South Orange Avenue.
  5. Submit the contractor-registration information through Orlando’s current process.
  6. Do not wait until the day an inspection is needed to discover expired insurance/registration documents.

Registered / limited specialty contractor

Orlando’s current registration page lists additional surety-bond requirements: at least $5,000 for state-regulated Registered contractors and at least $1,000 for certain specialty contractors not regulated by the state, subject to the current city instructions.

Permit/NOC workflow

  1. Submit the required permit application/plans.
  2. Use ProjectDox when the city routes the project through digital plan review.
  3. Monitor Permit Lookup for review status and fees.
  4. If contract value exceeds $5,000, record the NOC with the Orange County Comptroller before the statutory first-inspection stage.
  5. Submit the recorded NOC to Orlando.
  6. Post the certified copy at the jobsite.
  7. Schedule required inspections.
  8. Do not allow a permit to remain open six months without inspection activity; Orlando warns permits can expire.
  9. After all inspections pass, confirm the permit status is final.
Tampa / Hillsborough County

Tampa and Hillsborough: Use HillsGovHub + Tampa’s 2026 Accela Guides

Hillsborough County Contractor Licensing

813-272-5600
licensing@hcfl.gov

  1. Verify the state DBPR credential.
  2. Open Hillsborough Contractor Licensing.
  3. Use HillsGovHub to search applicable contractor-license records.
  4. For permit records, use Building & Site Records / General Search.
  5. HillsGovHub’s permit-search guide recommends quotation marks around an exact address when a general search returns too many results.
  6. For contractor-license records, create/log into the free account if the system requires authentication.

City of Tampa Construction Services

Contractor Licensing is administered by Hillsborough County:
813-272-5600

  1. Open Tampa Homeowner Resources.
  2. Use the city’s current Accela Guide — Search for Permits by Address.
  3. Open the project record.
  4. Use Find Permit Status Comments when review notes/status are unclear.
  5. Use Find Inspection Results to verify field outcomes.
  6. Use Upload Notice of Commencement when the NOC is required.
  7. If changing contractor, use the city’s current change-of-contractor guide/form rather than merely hiring someone else informally.
Fresh local documentation: Tampa’s Construction Services library contains 2026-dated Accela guides for permit searches, inspection results, contractor-license registration, NOC upload and multiple permit application types. Those current process guides are more useful than an older generic “contact your city” paragraph.
Hillsborough County’s construction-fraud page says a local complaint can be submitted with the complaint address, nearest major intersection, description and optional photos/files; the county currently states it will respond within five working days. Call 813-272-5600 for that local route.
Jacksonville / Duval County

Jacksonville: State License + Duval Records + JaxEPICS Inspection Results

Building Inspection Division
Ed Ball Building, 214 North Hogan Street, 2nd Floor
Jacksonville, FL 32202
904-255-8500
Current office hours listed: Monday–Friday, 7:00 a.m.–4:00 p.m.

  1. Open Jacksonville’s Contractor License and Complaint Search page.
  2. Use its Florida state-license link for Building, Plumbing, Electrical, AC and other state credentials.
  3. When relevant, use the Duval registered/specialty/journeyman records separately.
  4. Review county complaint/judgment links when useful.
  5. Open JaxEPICS.
  6. Search by permit number, confirmation number or project address.
  7. Review permit status.
  8. Check scheduled inspections and live field inspection results.
  9. If scheduling by phone, Jacksonville currently directs users to 904-255-8500 option 4 on workdays 7 a.m.–4 p.m.
  10. Verify final/closed project status before final payment.
Jacksonville currently requires electronic online permit submission for all permit types through JaxEPICS. Licensed contractors need the system credentials required to submit/pay electronically.
Local savings / incentives

Florida Contractor-Related Benefits Worth Checking Before You Buy the Upgrade

My Safe Florida Home

Eligible hurricane-mitigation projects can qualify for state assistance up to $10,000 under current program rules.

Jacksonville JEA HVAC

JEA currently advertises a $200 rebate for qualifying ENERGY STAR central air conditioners, heat pumps or ductless mini-split HVAC systems, plus a $50 ENERGY STAR smart thermostat rebate.

JEA Heat-Pump Water Heater

JEA currently advertises a $350 rebate for qualifying ENERGY STAR heat-pump water heaters of 50 gallons or less for eligible JEA residential electric customers.

JEA 2026 deadline: JEA’s current HVAC and heat-pump-water-heater pages state qualifying rebate applications must be submitted within 90 days of purchase/installation and no later than October 10, 2026. Recheck the live page before purchasing because utility rebates change.

JEA HVAC rebate: contractor-safe workflow

  1. Confirm the property is an eligible JEA residential electric account.
  2. Open the current rebate page before equipment purchase.
  3. Check whether the specific upgrade requires a JEA pre-qualified contractor.
  4. Separately verify the contractor’s Florida DBPR HVAC/mechanical license.
  5. Confirm the proposed equipment is ENERGY STAR and the complete matched system has qualifying AHRI ratings.
  6. Ask for the AHRI certificate covering all installed components.
  7. Keep the paid invoice and model numbers.
  8. Submit through the current pre-qualified contractor or customer application path.
  9. Meet the current 90-day and program-end deadline.

Free JEA Home Efficiency Kit

Current JEA residential customers can request a no-cost efficiency kit with energy/water-saving products such as LED lighting, leak-detection items, caulk and other conservation tools.

Free JEA efficiency assessments

JEA’s current Ways to Save program also lists free efficiency and irrigation assessments for eligible customers.

Official forms / statutes / PDFs

Florida Contractor Document Desk: Open the Right Source for the Right Question

DBPR Verify a Licensee

Use for: current license status, category and identity.

After opening: search number → open detail → status → business → complaint information → save dated copy.

CILB Application Center

Use for: Certified vs Registered and transaction-specific forms.

After opening: credential model → category → transaction → checklist → online/printable application.

Financial Responsibility PDF

Use for: 660 FICO, credit reports, liens/judgments and below-660 education.

CILB 10 Endorsement

Use for: exam-equivalency, licensing-equivalency, NASCLA and qualifying long-term out-of-state license routes.

CILB 32 Reciprocity

Use for: current reciprocal state/category route.

Recovery Fund Claim

Use for: qualifying last-resort homeowner claim after the underlying required judgment/order/award and collection steps.

Florida Statutes Chapter 489

Use for: license definitions, exemptions, discipline, payments, Recovery Fund and roofing/insurance rules.

Florida Construction Lien Law

Use for: NOC, Notice to Owner, releases, lien warnings and deadlines.

Document freshness: regulations, checklists, exam references, utility rebates and application PDFs can change without the page URL changing. Use this article to identify the correct document; use the live government document to complete the transaction.
Official contact router

Florida DBPR Contractor Licensing Phone, Address and Map

DBPR Customer Contact Center

850-487-1395

Current DBPR hours: Monday–Friday, 8:00 a.m.–5:00 p.m. Eastern Time.

DBPR / CILB

2601 Blair Stone Road
Tallahassee, FL 32399

DBPR notes that its Customer Contact Center can experience lower call volume around 8:00–10:00 a.m. and 3:30–5:00 p.m. Eastern Time. Call-volume conditions can change.
Frequently asked questions

Florida Contractor License Lookup FAQs

What is the official Florida contractor license lookup?

The official statewide source is Florida DBPR’s Verify a Licensee database. It supports searches by name, license number, city/county and license type.

What do I do after I find a contractor in DBPR?

Open the full Licensee Details record and check license category, current status, expiration, Certified or Registered authority, legal/DBA business information, qualified business and available complaints. Then verify the local project permit.

Is a Certified Florida contractor license statewide?

Yes. DBPR describes Certified construction licenses as statewide within the scope of the certification. Local permits and separately regulated trade requirements still apply.

Is a Registered Florida contractor license statewide?

Ordinarily no. DBPR describes Registered contractor licenses as limited to cities/counties where the contractor holds the applicable local certificate of competency. Narrow statutory emergency provisions can apply in declared natural emergencies.

How do I verify a Registered Florida contractor?

Verify the Registered credential in DBPR, identify the project jurisdiction, then check the local contractor-licensing/building authority to confirm that the contractor holds the necessary local competency authority.

Is complaint status the same as contractor license status?

No. DBPR warns that the status on a public complaint record describes that complaint. Use Licensee Details to determine current license status.

Does “Current, Active” prove a contractor is good?

No. Active status proves regulatory standing at the time of the live search, not workmanship, experience with your project, customer satisfaction or proper project permitting.

Can I search Florida unlicensed contractor complaints?

Yes. DBPR maintains a separate Unlicensed Activity Complaint Search. Search by person/business name and use county filtering cautiously because it relates to address-of-record information.

What number reports unlicensed contracting in Florida?

DBPR’s Unlicensed Activity Hotline is 1-866-532-1440. The agency also provides an online Report Unlicensed Activity service.

What happens if a Florida contractor takes more than 10% up front?

Florida Statutes §489.126 provides a residential timing framework: when the initial payment exceeds 10% of the contract price, the contractor generally must apply for required permits within 30 days and start work within 90 days after all required permits are issued, subject to statutory just-cause and written-extension provisions.

What can I do if the contractor took more than 10% and did not get permits or start?

Read current Florida Statutes §489.126. When its conditions apply, the statute provides a written-demand process using certified mail, return receipt requested, demanding permit application, commencement of work or refund. Significant disputes may also require DBPR, law-enforcement or legal remedies.

When does a Florida residential construction contract need the lien warning?

Florida Statutes §713.015 requires the statutory Construction Lien Law notice in covered direct contracts greater than $2,500 for improvements to residential real property consisting of one to four units.

When is a Notice of Commencement required for inspections?

Florida lien law requires recording/posting procedures for a Notice of Commencement. For a direct contract greater than $5,000, the permitting authority must receive specified recorded-NOC information/copy before the first inspection under the current statutory framework.

What should I do when I receive a Notice to Owner?

Keep it. Identify the subcontractor or supplier, track which payment should cover that party, and obtain appropriate lien releases before related progress/final payments. A Notice to Owner generally preserves potential lien rights; it is not itself the same as a recorded claim of lien.

Can a Florida roofing contractor waive my insurance deductible?

Florida law prohibits specified contractor practices involving waiver, rebate or improper treatment of property-insurance deductibles. Verify coverage and deductible obligations directly with your insurer.

Can a roofing contractor negotiate my insurance claim?

A contractor may not act as a public adjuster or interpret/adjust policy coverage for the insured unless separately licensed to perform that activity. Florida Statutes §489.147 contains the current restrictions.

Can I cancel a Florida roof contract after a hurricane emergency?

For qualifying residential roof contracts entered within 180 days of events covered by a Governor-declared emergency and within the declared area, current §489.147 provides a cancellation right generally within 10 days after execution or by the statutory official start date, whichever comes first.

Can I pull an owner-builder permit and hire an unlicensed contractor?

Florida’s owner-builder exemption has specific requirements and responsibilities and does not provide a general method for an unlicensed contractor to operate under an owner’s permit. Confirm the arrangement with the local building department before relying on an exemption.

What exams does a Florida General Contractor take?

The Division I General/Building/Residential examination structure includes Business & Finance, Contract Administration and Project Management. Use the current DBPR examination page and 2026 reference lists for administration and books.

What Florida contractor credit score is required?

CILB’s current financial-responsibility guidance uses a FICO-derived score of 660 or higher as part of its financial responsibility standard. Applicants below 660 must complete a board-approved 14-hour Financial Responsibility and Stability course.

How much liability insurance does a Florida General Contractor need?

CILB’s current FAQ lists minimum coverage of $300,000 liability and $50,000 property damage for General and Building contractors. Other categories generally use lower listed minimums or amounts otherwise established by rule.

Does NASCLA give me a Florida contractor license?

No. NASCLA is an examination credential, not a Florida license. Qualifying General, Building and Residential applicants may use NASCLA through Florida’s endorsement framework but still must satisfy Florida requirements and receive the Florida license.

Which states have Florida construction reciprocity?

Florida currently publishes qualifying CILB reciprocity agreements for General, Building and Residential categories involving Louisiana, Mississippi and North Carolina. Exact classification and application requirements must be checked on the current CILB 32 form.

When do Florida Certified contractors renew?

Certified CILB construction contractor licenses use an August 31 even-numbered-year renewal cycle. Registered construction contractor licenses use August 31 in odd-numbered years.

How many continuing-education hours do Florida contractors need?

Most CILB construction categories currently require 14 hours per renewal cycle, including mandatory subjects. General, Building, Residential, Roofing and Pool/Spa categories also have category-specific subject requirements.

Does Florida have a homeowner contractor recovery fund?

Yes. The Florida Homeowners’ Construction Recovery Fund is a last-resort fund for qualifying homeowners who meet statutory eligibility and underlying judgment, restitution or arbitration and collection requirements.

How much can the Florida Recovery Fund pay?

For eligible contracts entered on or after July 1, 2024, DBPR currently identifies maximum claim amounts of up to $100,000 for qualifying Division I claims and up to $30,000 for qualifying Division II claims, subject to actual eligible damages and other limits.

When must a Florida contract include the Recovery Fund notice?

Florida Statutes §489.1425 generally requires the Recovery Fund notice in covered residential repair, restoration, improvement or construction agreements unless all labor and materials do not exceed $2,500.

Is My Safe Florida Home accepting applications?

As of the August 31, 2026 review, the official MSFH site displays inspections and grants available and its current support center states the program is accepting applications. Funding/group availability can change, so the live Participant Portal controls.

How much is a My Safe Florida Home grant?

Current MSFH guidance provides matching or qualifying low-income grant structures with a maximum state contribution of up to $10,000, subject to program eligibility, funding and appropriation.

Can I use any contractor for My Safe Florida Home?

No. The homeowner must provide a contractor whose Florida DBPR license is Certified or Registered and appropriately covers the recommended improvement. The homeowner is responsible for verifying the contractor.

Can I start My Safe Florida Home work before grant approval?

No. Program guidance warns that construction performed before the required approval can become ineligible for funding.

Does Florida waive contractor-license fees for veterans?

DBPR maintains several military programs. A qualifying veteran or spouse applying within 60 months after honorable discharge can receive waiver of the initial license, application and unlicensed-activity fees, excluding examination/incidental fees. Other military licensing-fee waiver routes also exist.

Does Florida have a low-income contractor-license fee waiver?

Yes. Qualifying applicants with annual household income at or below 130% of the applicable federal poverty guideline can request waiver of the initial licensing fee. Other fees remain due.

How do I search a Miami-Dade contractor?

Verify the Florida DBPR record first, then use Miami-Dade’s Contractor Inquiry and Complaint Search when county competency/local licensing information is relevant. Also search the building permit and inspection history.

How do I search a Broward contractor?

Broward’s official contractor database supports searches by contractor name, CC Number or contracting firm/company. Its company search supports percent signs for partial searches.

What should Palm Beach County homeowners check before final payment?

Palm Beach County advises homeowners to verify license and insurance, make sure a required permit is pulled, obtain receipts and not make final payment until the permit is closed out.

Does Orlando require state-certified contractors to register locally for permits?

Yes. Orlando’s current contractor-registration instructions require contractors obtaining city permits to register with Permitting Services and provide items including DBPR certification, business tax receipt and workers’ compensation documentation or exemption.

Where do Tampa homeowners check permits?

The City of Tampa publishes current Accela guides for searching permits by address/record number, finding permit status comments and inspection results, uploading NOCs and handling contractor changes. Contractor licensing is administered through Hillsborough County.

How do Jacksonville homeowners check inspection results?

Use Jacksonville’s JaxEPICS system and search by permit number, confirmation number or address. Jacksonville states that inspection results can be viewed as field inspectors update the system.

Are Jacksonville contractor-related rebates available?

JEA currently offers several residential efficiency rebates, including qualifying HVAC, smart thermostat and heat-pump-water-heater incentives. Verify the live JEA eligibility, equipment, contractor and submission deadline before purchase.

A Florida Contractor Is Not Fully Verified Until State, Business, Local and Project Records Agree

Before hiring: match the DBPR license, classification, Certified/Registered authority, qualified business, complaints, insurance and local permit.

Before paying: understand the contract amount, deposit, §489.126 timing rule, Notice of Commencement, Notice to Owner, lien releases and required inspections.

Before filing a complaint or claim: preserve the complete contract/payment/permit record and choose the correct DBPR, local, Recovery Fund, insurance or court route instead of assuming one complaint solves every remedy.

Research reviewed August 31, 2026. Individual license/complaint status, renewal standing, permit status, application forms, grants and local incentives can change. Always reopen the current government record immediately before hiring, paying, permitting, applying, renewing or filing a claim.