Utah Contractor License Lookup: Verify More Than an “Active” Status
The official Utah contractor search is the Division of Professional Licensing Licensee Lookup & Verification System. Finding a company name is only the first check. A useful verification also matches the licensed legal entity, classification, expiration, disciplinary history, insurance, business registration, project permits and—on Utah construction projects—State Construction Registry notices.
This page is designed so you can finish those checks without opening another generic search result. Every major government resource below includes an exact “after the link opens, do this next” workflow.
Fast Answer: Where Do I Check a Utah Contractor License?
Use Utah’s official Licensee Lookup & Verification System. Search the contractor’s license number when possible, open the exact record and compare the licensed name, current status, expiration and contractor classification with the written bid or contract.
Official Utah DOPL Contractor Lookup: Exact Click-by-Click Guide
Have the contractor’s written bid in front of you. Your goal is to prove that the exact entity requesting your signature and money is currently authorized for the work being offered.
Collect the contractor’s identifying information
Write down the legal company name, any DBA/trade name, Utah license number, estimator/salesperson name, project address and the business/person named as the payment recipient.
Open Utah’s official Licensee Lookup
Use the Utah.gov DOPL search linked below. Do not substitute Google Business listings, social profiles, Yelp, BBB or a screenshot sent by the contractor.
Use License Number first when available
Enter the core number. If the contractor gave you the specific four-digit identifier, include that when the system permits it so you target the correct license rather than another credential held by the same licensee.
If you only have a name, choose Name and Profession
Enter the business/person name. Use BEGINNING with first when the beginning of the legal name is known. Use CONTAINING if the contractor advertises under a shortened trade name or you are uncertain about the full spelling.
Narrow Profession to CONTRACTOR
Utah’s DOPL database includes many professions. Narrowing avoids accidentally treating an individual’s electrician, plumber or other occupational credential as proof that the contracting business itself holds the required contractor license.
Open the exact matching record
Do not stop at a search-results row. Open the detail record and copy the licensee name, license number, status, expiration and classification into your due-diligence notes.
Match the legal licensee to the contract
The entity on DOPL should connect clearly to the company signing the contract, named on the invoice and accepting payment. Resolve an unexplained LLC/DBA/person-name mismatch before sending a deposit.
Check current status—not merely existence
A historical record does not prove current authority. Read the displayed status and expiration. If the license is probationary, open DOPL’s disciplinary-action system and review the governing action.
Compare classification with project scope
A roofing specialty, residential nonstructural remodel classification, HVAC classification and general building classification are not interchangeable. Match the actual work being sold to the displayed authority.
Verify insurance, permits and SCR separately
DOPL status does not prove a permit exists, prove current insurance to you, or show every subcontractor/supplier on your project. Those checks have separate official routes below.
Recheck if the start date moves
If weeks or months pass before construction, repeat the official lookup shortly before mobilization or a major payment—especially when the credential is approaching expiration.
- Choose License Number if you have it.
- If not, choose Name and Profession.
- For a name search, choose CONTRACTOR as Profession.
- Try BEGINNING with; retry with CONTAINING if needed.
- Open the matching record.
- Write down legal name.
- Write down license number.
- Write down status.
- Write down expiration.
- Write down classification.
- Compare all five with the written bid.
- Continue to the discipline, entity, insurance and permit checks below.
Utah Contractor Verification Risk Checker
This independent checklist does not access Utah databases. Complete it only after reviewing the official records.
What the Utah DOPL Result Proves—and What It Does Not
| Field/check | Useful meaning | It does NOT prove | Next check |
|---|---|---|---|
| Licensee name | Entity/person associated with the credential. | That an unrelated payee or DBA can use it. | Utah business entity search + contract. |
| Active status | Public DOPL licensing status. | Workmanship, customer satisfaction or permit issuance. | Discipline + project permit. |
| Active on Probation | Credential remains subject to a probationary status. | That there are no restrictions or compliance conditions. | Read the actual agency-action record. |
| Expiration | Current license period endpoint. | That future renewal will occur. | Recheck when project crosses expiration. |
| Classification | Authorized contractor scope. | Permission to self-perform unrelated regulated trades. | Compare classification/specialty rules. |
| Contractor license | State contractor licensing. | That building/electrical/plumbing/mechanical permits exist. | Local jurisdiction. |
| DOPL record | Professional license data. | Current Utah corporation/LLC standing. | Division of Corporations search. |
Can’t Find the Contractor? Use This Utah Search Sequence
If a company-name search fails
- Remove punctuation.
- Remove LLC, Inc., Corp. or similar suffix.
- Switch BEGINNING with → CONTAINING.
- Search the legal company name rather than truck/signage DBA.
- Search the individual owner’s name only as a secondary check.
- Ask the contractor for the exact Utah license number.
If a license number fails
- Check digits for transcription error.
- Try the core number without the specific identifier.
- Confirm the number is a contractor license—not a business registration or employee trade license.
- Ask DOPL to explain the record before accepting a replacement number.
Free Utah License Lookup vs Official License Verification
A homeowner normally needs the free lookup. Another licensing agency, employer or credentialing body may require Utah to send a primary-source verification directly.
Free public search
Cost: free.
Use for: hiring due diligence, status, expiration, classification and public-record verification.
Electronic official verification
Utah.gov’s verification workflow can email a verification PDF directly to the recipient. Current instructions state a charge of $5 per recipient email address.
DOPL’s general fee schedule separately lists a $20 Verification of Licensure fee for its standard/manual verification service. Choose the service the receiving authority actually requires.
- First ask the receiving agency whether it accepts an emailed primary-source verification.
- Open your exact Utah license record.
- Find Obtain a License Verification.
- Enter the recipient’s official email address—not merely your own unless that is what the recipient requested.
- Pay the fee shown by Utah.gov.
- DOPL’s system sends the verification PDF directly.
- If a sealed/manual verification is required instead, use DOPL’s current verification instructions and fee schedule.
How to Check Utah DOPL Disciplinary Actions and Citations
DOPL maintains a separate Agency & Disciplinary Actions search. Search by the contractor’s exact license number whenever possible.
- Copy the license number from Licensee Lookup.
- Paste it into Entity Name OR License Number.
- Run the search.
- If you search by name, confirm the result is the same business—not a similarly named company.
- Open each relevant action/citation.
- Read the action date.
- Read the conduct/finding described.
- Read the final disposition, restriction or probation term.
- Check whether any condition remains current.
- Do not infer the current consequence from the headline alone.
Match the Contractor to Utah’s Business Entity Record
A DOPL contractor license and Division of Corporations registration are separate. Use the entity database when the licensed contractor is an LLC, corporation, partnership or DBA.
- Click Search Business Entity Records below the UtahID login where available.
- Search by entity name or entity number.
- If needed, search by principal/registered-agent name.
- Open the exact entity.
- Compare legal name with DOPL.
- Review entity status.
- Review principals where publicly available.
- Open Filing History if you need to understand a name change or entity history.
- Resolve a mismatch before signing or paying.
Utah Construction Business Registry: When It Helps
Utah’s Construction Business Registry is a free contact database for licensed/registered construction professionals who choose to participate.
Good for discovery
Search participating professionals by contractor type/classification and locality.
Not proof of licensing
Only active licensees who opted in appear. Missing from CBR does not mean unlicensed.
Correct workflow
CBR candidate → copy license number → DOPL Licensee Lookup → disciplinary action → permits.
- Use Basic Search for a broad contractor/classification search.
- Use Advanced Search if you know company, license number, city or ZIP.
- Select contractor/profession type.
- Choose the classification relevant to your project.
- Add city/ZIP when looking for nearby participating contractors.
- Copy the license number of a possible candidate.
- Leave CBR and verify that number in DOPL Licensee Lookup.
Utah Contractor Classifications You May See in the Lookup
| Classification | High-level purpose | What the homeowner should verify |
|---|---|---|
| B100 | General Building Contractor. | General building scope still does not erase separately licensed electrical/plumbing/HVAC requirements. |
| R100 | Residential & Small Commercial Contractor. | Property and project type fit current R100 scope. |
| E100 | General Engineering Contractor. | Project is engineering/infrastructure work within that scope. |
| H100 | HVAC Contractor. | Current H100 qualifier/exam requirements and any permit. |
| E200 | General Electrical Contractor. | Required master-electrician qualifier and local electrical permit. |
| E201 | Residential Electrical Contractor. | Residential electrical scope fits the project. |
| P200 | General Plumbing Contractor. | Required master-plumber qualifier and local plumbing permit. |
| P201 | Residential Plumbing Contractor. | Residential plumbing scope fits the project. |
| R101 | Residential/Small Commercial Non-Structural Remodel and Repair. | Do not use it as proof of structural general-contractor authority. |
| S202 | Solar photovoltaic specialty. | Electrical connections/personnel may trigger additional professional requirements. |
| S280 | Roofing specialty. | Exact roofing scope and local re-roof permit. |
| S310 | Foundation/excavation/demolition-related specialty scope. | Local demolition/excavation approval and utility-clearance requirements. |
| S370 | Fire Suppression Systems Contractor. | Special qualification/exam and fire-authority permits. |
| S510 | Elevator specialty. | Qualifier’s required Utah elevator-mechanic credential. |
| S700 | Limited Scope Contractor. | Ask for the exact DOPL-approved written scope. S700 is not universal contractor authority. |
Current Utah Contractor Insurance: $1M / $2M—and Why One PDF Says $3M
There is a useful 2026 document conflict that applicants and insurance agents should know about.
March 5, 2026 application PDF
DOPL’s contractor application PDF version v20260305 was prepared before the later 2026 insurance-rule adjustment and contains earlier $1 million / $3 million aggregate wording.
Current live rule / DOPL guidance
The subsequent current DOPL contractor announcement and current rule use $1 million per occurrence / $2 million aggregate. DOPL’s May 2026 rulemaking explanation states the aggregate was adjusted from $3 million to $2 million after construction-industry feedback regarding commercially available policies.
Certificate details
- Insured name should match the licensed/applicant business.
- Coverage must fit the scope of work.
- DOPL must be listed as certificate holder under current application guidance.
- Policy must remain current while the license is active.
- Workers’ compensation is handled separately based on employee status.
- Compare the insured name with the DOPL licensee.
- Check policy effective and expiration dates.
- Check limits.
- Confirm the policy type is relevant to the construction work.
- For a major project, ask the agent/carrier to confirm current coverage directly.
- Ask how subcontractor insurance is handled.
Utah Handyman Exemption: Why “Under $7,000” Is Incomplete Advice
Utah law has a limited contractor-license exemption for qualifying alteration, repair, remodeling, addition or improvement work with a total agreed project value of less than $7,000, including labor, materials and changes/additions.
Projects greater than $3,000
For an otherwise qualifying handyman-exemption project with total value above $3,000, current Utah requirements call for the applicable DOPL handyman registration/affirmation process.
Current registration fee
DOPL’s current fee schedule lists $45 for Handyman Exemption Registration and $45 for renewal.
Handyman insurance
DOPL’s March 2026 Handyman Pre-Registration Checklist requires $1 million per incident / $3 million aggregate.
Renewal
Handyman registration uses the November 30 odd-year renewal cycle. Contractor CE does not automatically apply to this registration in the same manner as a contractor license.
- Open the current Pre-Registration Checklist.
- Confirm the project actually qualifies for the exemption.
- Register the LLC/corporation/partnership/DBA where applicable.
- Get the liability certificate in the exact registrant name.
- Use the handyman-specific insurance limits shown on the current checklist.
- If employees exist, prepare workers’ compensation and employer registrations.
- If no employees, obtain the required Utah Labor Commission coverage waiver.
- Pay the current $45 registration fee.
- Follow current filing instructions; do not email a manual application where DOPL says email submission is not accepted.
How to Apply for a Utah Contractor License Without Starting With the Wrong Form
DOPL currently posts a contractor application processing estimate of approximately 6–7 weeks. A complete application starts with classification and qualifier eligibility—not the payment screen.
Select the exact classification
Choose B100, R100, E100, H100, E200/E201, P200/P201 or an applicable specialty. Read the scope before completing education.
Identify the qualifier
The qualifier is the individual whose education, examination, experience or professional credential supports the classification. Different classifications can have different qualifier requirements.
Resolve pre-license education
The current application lists a 25-hour minimum prelicense course plus a five-hour Business & Law course for General/Primary classifications, unless another allowed pathway applies.
Resolve the examination requirement
General classification qualifiers use the applicable Utah Business & Law pathway. H100 additionally requires its HVAC examination. Do not wait until after application to discover a missing exam.
Resolve experience
General classifications generally require two years / at least 4,000 hours of paid construction-industry experience or another accepted pathway. Specialty-only classifications do not use that same broad requirement, though specialty-specific qualifications can apply.
Register the legal business
Register applicable corporations, LLCs, LLPs or partnerships with Utah’s Division of Corporations and obtain EIN and employer/tax accounts required by your situation.
Prepare current liability insurance
Use the current live contractor requirement of at least $1 million per occurrence and $2 million aggregate and follow DOPL’s certificate-holder instructions.
Address workers’ compensation
If the business has employees, prepare the workers’ compensation certificate and applicable Utah employer registrations. If it has no employees and qualifies, obtain the Utah Labor Commission coverage waiver required by DOPL.
Calculate qualifier + classification fees
The current contractor application uses $50 per qualifier + $175 per classification + $1 Electronic Reference Library surcharge.
Use My License One or the current manual route
DOPL’s online system uses UtahID. Manual applications may be mailed or delivered as currently instructed; the 2026 contractor application states applications are not accepted by email.
- Select General Contractor or Specialty Contractor.
- Open the classification list.
- Open the current PDF checklist even if applying online.
- Complete education/exam/experience prerequisites.
- Register the business entity.
- Collect insurance and workers’ comp documents.
- Create UtahID.
- Enter My License One.
- Start the contractor application.
- Upload supporting documents clearly.
- Save a full copy of the submission.
Details Hidden Inside Utah’s 2026 Contractor Application PDF
The March 2026 DOPL contractor packet contains several practical requirements that are easy to miss when reading only the landing page.
Incomplete applications
The current application warns that incomplete applications will be denied. Build the packet from its checklist rather than submitting first and hoping DOPL asks for missing documents later.
Public-record notice
The application states that application material is generally a public record except information classified as private, controlled or protected under Utah’s Government Records Access and Management Act or another law.
No SSN pathway
The current application provides alternatives for an applicant without a valid Social Security number, including specified ITIN/A-number/passport and Utah-employer documentation routes, subject to lawful-presence requirements.
Small ownership interests
The application includes an additional $20 registration fee for certain owners with less than an 8% ownership interest in an unincorporated applicant and directs applicants to the relevant ownership appendix.
Trust ownership
If the company is wholly or partly owned by a trust, the current packet requests trust-agreement documentation.
Layered ownership
For parent-company ownership, the application requests supporting documents/ownership diagrams and a complete owner/officer/director structure as applicable.
Qualifier questionnaire
The packet asks about licensing discipline and criminal matters using specified current and historical time periods. “Yes” responses require supporting documentation explaining circumstances and final result.
Endorsement ownership test
The current packet says at least 50% of the proposed Utah ownership must match the license used for endorsement and limits how much ownership may have changed within the preceding year under that route.
In person / express: Division of Professional Licensing, 160 E 300 S, Salt Lake City, UT 84111.
U.S. Postal Service: Division of Professional Licensing, P.O. Box 146741, Salt Lake City, UT 84114-6741.
Contractor application questions: b4@utah.gov.
Utah Contractor Application Fee Helper
Uses the current application formula. It excludes card/online transaction charges and situation-specific fees.
Official Utah Contractor Pre-License Course Providers
DOPL’s contractor page identifies these as the approved organizations currently authorized to administer required contractor pre-license courses.
Associated Builders & Contractors — Utah
DOPL lists approved options serving Salt Lake, St. George and Vernal.
- Tell ABC which DOPL classification you need.
- Confirm whether your route needs 25 hours or the additional Business & Law course.
- Confirm upcoming location/date.
- Keep the completion certificate for DOPL.
Associated General Contractors of Utah
DOPL lists approved options in Salt Lake and St. George.
- Verify the course is the current DOPL pre-license course.
- Ask which classification path it satisfies.
- Ask about night-class availability if needed.
- Retain proof of completion.
Utah Home Builders Association
DOPL lists approved HBA options serving Draper, St. George, Ogden and Logan and notes Spanish/night-class options.
- Check which location has the next class.
- If English is a barrier, ask about current Spanish scheduling.
- If daytime work conflicts, ask about the night class listed by DOPL.
Utah Contractor Business & Law and H100 Exam Guide
DOPL currently lists the Utah Contractor Business & Law examination for B100, E100, H100, R100, E200, E201, P200 and P201 routes where another qualifying alternative does not apply.
B100
General Building
E100
General Engineering
R100
Residential & Small Commercial
H100
HVAC Contractor
E200
General Electrical
E201
Residential Electrical
P200
General Plumbing
P201
Residential Plumbing
- Find your contractor classification.
- Open the current examination handbook.
- Check permitted references.
- Check identification requirements.
- For H100, confirm you schedule both required exams.
- Choose an authorized Prov test location or current authorized online option when eligible.
- If ADA accommodations are needed, obtain approval before scheduling.
- Save the passing documentation for your application.
Utah Contractor Reciprocity? DOPL Calls It Licensure by Endorsement
DOPL explains that Utah does not use contractor “reciprocity” as an automatic state-to-state license transfer. Qualifying out-of-state contractors can apply through licensure by endorsement.
- Find whether DOPL considers your jurisdiction/license substantially equivalent.
- Confirm the out-of-state license is active and in good standing.
- Confirm you meet the minimum licensed-experience condition.
- Request official license verification from the issuing authority when required.
- Make sure ownership information is included.
- Compare current ownership with DOPL’s 50% ownership-continuity rules.
- Prepare Utah business, insurance and workers’ compensation items.
- Apply to Utah DOPL.
- Do not advertise the endorsement application as an issued Utah license.
Utah Contractor Renewal: November 30 of Odd-Numbered Years
Contractor licenses renew on a two-year cycle and expire November 30 of odd years. From this page’s August 31, 2026 review date, the next regular contractor expiration is November 30, 2027.
Base renewal fee
DOPL’s current profession fee schedule lists the contractor renewal at $128, with the separate $1 electronic-library surcharge shown in the fee table. Older/manual forms may therefore display a $129 combined amount.
Continuing education
Standard contractor law requires 6 approved CE hours during each two-year renewal cycle.
Use a computer
DOPL specifically advises contractor licensees to complete renewal on a desktop/laptop rather than relying on a mobile device.
Renewal click path
- Use a computer.
- Sign in to My License One with UtahID.
- Scroll to Existing License/Registration Holders.
- If the license is missing, click Don’t see your license….
- Search using the details on the DOPL renewal notice.
- When the license appears, use the three-dot Actions menu.
- Start Renewal.
- Confirm CE.
- Confirm business registration.
- Confirm liability insurance.
- Confirm workers’ compensation / coverage waiver.
- Review disclosure questions.
- Pay the amount displayed by the live system.
2026 CE changes worth knowing now
H100 HVAC
At least 3 of the 6 hours must directly relate to installation, repair or replacement of heating, ventilation or air-conditioning systems.
Landscape specialty
Effective May 6, 2026, H.B. 313 requires DOPL to identify specialty contractors primarily engaged in landscape work. For those contractors, at least 1 of the 6 hours must cover specified water-conservation landscaping or fire-risk-management landscaping topics.
January 1, 2027: Utah Contractor Law Structure Changes
Utah’s 2026 Legislature passed H.B. 40, which recodifies/restructures the Construction Trades Licensing Act effective January 1, 2027.
2026 action
Use current Title 58 / Chapter 55 rules and current DOPL application material as applicable to the action being completed before January 1, 2027.
2027 action
Re-verify statutory section numbers, licensing structure, CE references and DOPL forms after recodification becomes effective.
State Construction Registry: Find Who Has Preserved Lien Rights on the Project
Utah’s State Construction Registry (SCR) adds a project-level check that a normal contractor-license article misses. It helps property owners identify parties that filed construction notices and expect payment.
How a homeowner checks the property
- Create or use an existing Utah.gov account.
- Log in.
- Choose Advanced Search.
- Search by Tax Parcel ID for the most precise private-property search.
- You can also search the street address.
- Open filings connected to the property.
- Note contractors, subcontractors and suppliers that filed Preliminary Notices.
- Choose Track a Project.
- Enter the County Tax Parcel ID.
- Monitor email alerts when new SCR notices are filed.
- Before final payment, compare those parties against payment/lien-release documentation.
Important contractor SCR filings
| Filing | Current SCR guidance | Practical effect |
|---|---|---|
| Preliminary Notice | Original contractors should file within 20 days after starting work to maintain lien rights. | Creates visibility and helps tie parties to the project. |
| Notice of Commencement | SCR states this is required for government jobs and must be filed within 15 days after work starts at the jobsite. | Can affect payment-bond claim notice obligations on public projects. |
| Intent to Complete | May be used on qualifying non-bonded projects over $500,000 at least 45 days before completion. | Triggers Remaining to Complete filings for parties with Preliminary Notices. |
| Notice of Completion | May be filed after final inspection, certificate of occupancy or substantial completion. | Remaining Preliminary Notices have 10 days; lien period can be reduced from 180 to 90 days under SCR guidance. |
SCR technical support: 801-983-0275, option 6 · support@helpdesk.utah.gov
Utah Residence Lien Protection and Certificate of Compliance
Utah’s Residence Lien Restriction and Lien Recovery Fund Act can protect qualifying homeowners from certain mechanics’ liens after they have paid the contractor in full and satisfy statutory requirements.
Contract above $5,000
DOPL’s homeowner guidance generally requires a written contract with a qualifying licensed contractor/developer/factory-built housing retailer, payment in full and applicable occupancy requirements, among the complete statutory conditions.
Contract $5,000 or less
DOPL provides a separate lower-value Certificate/Affidavit route. Use the form that matches the total general-contract amount.
- Choose Homeowners.
- Determine whether the total contract is over $5,000 or $5,000 or less.
- Open the correct Certificate of Compliance checklist/form.
- Gather the written contract where required.
- Gather proof of full payment.
- Gather project completion/occupancy evidence.
- Gather the recorded lien and service documents.
- If sued, calculate the 30-day DOPL receipt deadline immediately.
- Follow current mailing/in-person instructions; DOPL’s Certificate forms state email/fax submission is not accepted.
- Keep proof of delivery.
- Use an attorney for foreclosure/lien litigation.
Construction programs: 801-530-6719 · constructionprograms@utah.gov
DOPL’s Optional Residential Construction Agreement
Utah DOPL and the Division of Consumer Protection provide an optional residential construction agreement that homeowners and contractors may customize in writing. DOPL makes clear that the template is optional and is not legal advice.
Exhibit A
Project plans and specifications.
Exhibit B
Written change-order structure.
Exhibit C
Proof of licensure and insurance.
- Download the current agreement and all exhibits.
- Write a detailed scope instead of “remodel kitchen” or “replace roof.”
- Identify brands/models/grades or objective substitution rules.
- Attach drawings and specifications.
- Put the verified DOPL license in Exhibit C.
- Attach/record insurance evidence.
- Define permit responsibility.
- Define payment milestones tied to completed work.
- Use written change orders before extra work begins.
- Address subcontractor/supplier payment and lien-release procedures.
- For significant projects, have Utah construction counsel review the contract.
Utah Local Permit Desks: What to Check After the DOPL License
A Utah contractor license does not replace a project permit. The correct permit office depends on the actual project address.
Salt Lake City
Building Services
451 South State Street, Room 215
Salt Lake City, UT 84111
Permit Processing: 801-535-7968
Planning/Zoning: 801-535-7700
Inspection scheduling: 801-535-6000
- For a new structure/addition, commercial change of use or exterior historic-district work, contact Planning first.
- Create/log into Citizen Access Portal.
- Apply under the Building tab.
- Watch email for the ProjectDox invitation.
- Complete the correct residential/commercial/site-development submission checklist.
- Upload plans/documents to ProjectDox.
- Complete Applicant Upload Task.
- Pay plan-review fee balance so the project enters the review queue.
- Respond to every reviewing-agency comment.
- Finalize permit issuance after approval.
- Obtain separate electrical, plumbing, mechanical, fire-alarm or fire-suppression permits when required.
- Request inspections before covering work.
Provo
Development Services
445 W Center Street, Suite 200
Provo, UT 84601
Main: 801-852-6400
Building: 801-852-6428
Planning: 801-852-6419
Office hours: Monday–Thursday, 7 a.m.–6 p.m.; building permits issued until 5:30 p.m.
- Select Apply for Building Permits.
- Open Project Requirements.
- Select the checklist matching New Commercial, New Residential, Residential Remodel, Solar PV or your project.
- For water heater/furnace/AC/electrical work, open the specific supporting-document list.
- Upload the required plans and diagrams.
- Respond to plan-review comments.
- Schedule required inspections.
- Keep final approvals with the project file.
Ogden
Building / Development Counter
2549 Washington Boulevard
Ogden, UT 84401
Building Services: 801-629-8985
Permits / inspections: 801-629-8950
Planning: 801-629-8930
- Identify project type.
- For new construction, contact Planning before submitting.
- Prepare the complete plan set as one PDF where instructed.
- Add structural calculations when applicable.
- Add geotechnical report where applicable.
- Add ResCheck/ComCheck energy documentation when required.
- Do not submit a partial plan set; Ogden states partial submittals are not accepted for review.
- Pay the current application deposit shown by the city when the application is accepted.
- Complete specialty clearances such as asbestos/power/gas/water when the project requires them.
Lehi
Building & Inspections
153 N 100 E
Lehi, UT 84043
Building / inspections: 385-201-1035
- Use the Building Permit Submittal Portal.
- Select the project checklist: New Commercial, Tenant Finish, Commercial Remodel, New Residential, Addition, Basement, Solar or other applicable type.
- Submit plans electronically.
- Include compliance checks, structural and geotechnical reports when applicable.
- After approval, print a hard copy of city-stamped plans for the jobsite.
- For solar projects, also complete Lehi City Power requirements.
- Allow at least 24 hours’ notice for inspections.
- Call 385-201-1035 to schedule; the city states inspections are not scheduled by voicemail, email or online.
Utah & Local Repair Grants, Contractor Opportunities and Project Benefits
These programs are separate from contractor licensing. They can reduce project cost, provide contractor business opportunities or accelerate local permitting when eligibility fits.
Salt Lake City Home Repairs
Salt Lake City’s Housing Stability Division accepts Home Repairs applications year-round for qualifying owner-occupied homes with major health, safety or structural repair needs.
- Household generally must be at or below 80% AMI.
- Home must be within Salt Lake City.
- Current maximum assistance: up to $50,000.
- Funding structure can include no- or low-interest assistance depending on eligibility.
- Confirm the home is inside SLC boundaries.
- Confirm owner occupancy.
- Review current AMI limits.
- Collect photo ID, occupancy proof, homeowner insurance and income documents for adult household members.
- Create a Neighborly account.
- Choose Housing Programs.
- Submit the Home Repair application.
- Check status through View Application.
- Do not hire/start city-funded repair work before following program instructions.
Salt Lake City Minor Repairs
Current program assistance is designed for qualifying low-income owner-occupied households with a senior or person with a disability.
- Applications open year-round.
- Repair assistance is free for qualifying participants.
- Current maximum: $1,500 per household.
- Senior means at least age 62 under the city’s program description.
Provo Commercial Façade Improvement Program
Provo is currently accepting applications for its commercial façade program. The city describes grants of up to $50,000 based on qualifying job creation/retention and program conditions.
Current city information states that the business/building owner matches every $3 of grant funds with $1 in other eligible improvement spending.
Eligible improvements can include masonry repair, exterior finishes, historically significant details, windows/doors, awnings, lighting, ADA work, signs, architectural/design costs and building-permit fees.
- Confirm the property is in Provo.
- Open current program guidelines.
- Confirm building/business eligibility.
- Confirm job-creation/retention requirement.
- Determine eligible improvements.
- Confirm owner’s matching contribution.
- Apply before committing grant-dependent construction work.
Program Administrator: 801-852-6176
Salt Lake City Neighborhood Business Improvement Program
SLC’s NBIP provides qualifying businesses/property owners in selected neighborhoods with façade/business-improvement grant assistance of up to $50,000.
Current city information says the next application period is planned for Spring 2027. Priority can include small/local businesses and eligible businesses owned by women, minorities or veterans.
Contractor opportunity: Salt Lake City Housing Stability
Salt Lake City recruits general and specialty contractors for city-supported home rehabilitation, roof repair/replacement, lead work, business façade improvements and seismic retrofit work.
Current minimum qualifications include Utah DOPL licensing, bonding, liability/workers’ compensation evidence and the city’s contractor survey/references.
- Keep the Utah DOPL license current.
- Resolve pending/unresolved licensing issues.
- Maintain bond, liability and workers’ compensation requirements.
- Open the Housing Stability Contractor Information page.
- Follow the annual approved-contractor application announcement.
- Register for Utah procurement/U3P notifications where directed.
- Respond to project bid notices if accepted into the contractor pool.
Utah Home Energy Rebate warning
Do not quote a Utah state Home Energy Rebate to a customer as currently available. The Utah Office of Energy Development’s current program page states the federally supported Home Energy Rebate program is on hold until further notice pending federal approval/funding.
Before You Hire a Utah Contractor: 18 Checks
- Get the complete DOPL license number in writing.
- Search the exact number in DOPL Licensee Lookup.
- Match the licensed legal name with the contract.
- Match the payment recipient with the licensed entity.
- Check current status.
- Check expiration.
- Check contractor classification.
- Search DOPL disciplinary actions.
- Check Utah business-entity registration when applicable.
- Request current general liability insurance.
- Ask about workers’ compensation when workers will be on site.
- Verify separately regulated electrical/plumbing/HVAC or specialty personnel when applicable.
- Verify the local building/trade permits independently.
- Search the property in Utah SCR.
- Turn on Track a Project alerts.
- Use a detailed written contract.
- Require written change orders.
- Before final payment, reconcile SCR notices with lien-release/payment evidence.
Contractor Problem? DOPL Is Not the Only Complaint Route
| Your problem | Best first regulatory route | What that route can address |
|---|---|---|
| Unlicensed contracting | Utah DOPL | Professional licensing/unlicensed-practice enforcement. |
| Working beyond contractor classification | Utah DOPL | Possible licensing-law violation. |
| Professional/unlawful conduct under Title 58 | Utah DOPL | DOPL investigation and regulatory discipline. |
| Unpermitted / code-compliance construction | Local building department | Permit, inspection and code enforcement. |
| Business misrepresentation / consumer sales issue | Utah Division of Consumer Protection where jurisdiction fits | Consumer-law enforcement. The DCP decision tool itself notes ordinary workmanship disputes may fall outside its jurisdiction. |
| Unpaid subcontractor/supplier / lien | SCR + Utah lien legal process | Construction notices and statutory lien rights. |
| You paid the contractor but receive qualifying residential lien | DOPL Residence Lien / Certificate of Compliance | Possible homeowner statutory lien protection. |
| You want money damages/refund for breach | Private legal / contractual remedy | DOPL explicitly says it does not act as your attorney or recover monetary loss for you. |
How to File a Utah DOPL Contractor Complaint
Identify the exact contractor
Search DOPL first and copy the legal name and license number. For suspected unlicensed practice, save the advertisement, business name, phone, URL and payment identity.
Open DOPL File a Complaint
Use this route for possible violations of Utah occupational/professional licensing law.
Choose online or manual filing
DOPL offers electronic filing and a manual form that can be mailed or delivered.
Complete every applicable section
DOPL tells complainants to write N/A where a section truly does not apply instead of simply leaving the evaluation incomplete.
Write a chronological factual narrative
Identify dates, promises, work performed, payments, licensing representation, permit issue, abandonment/scope issue and efforts to resolve the matter.
Attach evidence
Include relevant contract, proposal, invoice, change orders, payment evidence, advertisements, emails/texts, photographs and permit/inspection records.
Submit and preserve your copy
Save exactly what you filed and any submission confirmation. Be prepared to provide further evidence or testimony if DOPL investigates.
Questions before filing: 801-530-6630
Utah DOPL Phone, Email, Address and Application Contact
Main DOPL
801-530-6628Utah toll-free: 866-275-3675
General: dopl@utah.gov
Contractor applications: b4@utah.gov
Physical office
Heber M. Wells Building
4th Floor
160 East 300 South
Salt Lake City, UT 84111
Current general office hours: Monday–Friday, 8 a.m.–5 p.m., excluding legal holidays.
USPS contractor application address
Division of Professional Licensing
P.O. Box 146741
Salt Lake City, UT 84114-6741
Utah DOPL Office Map
Heber M. Wells Building, 160 East 300 South, Salt Lake City, UT 84111
Official Utah Sources: Which Link Solves Which Task?
| Official resource | Use it for | After opening |
|---|---|---|
| DOPL Licensee Lookup | Verify contractor license. | Number/name → Contractor → exact record → status → expiration → classification. |
| DOPL Disciplinary Actions | Check regulatory history. | Paste license # → open action → read disposition/current terms. |
| Utah Business Registration | Verify LLC/corporation/DBA identity. | Search entity → open exact record → compare principals/name/status. |
| Construction Business Registry | Discover participating active construction professionals. | Classification/local search → copy license # → verify in DOPL. |
| 2026 Contractor Application PDF | Qualifier, fees, ownership, education, questionnaire and filing requirements. | Read checklist → qualifier affidavit → classification-specific pages → ownership/employment/insurance. |
| DOPL Exam Information | Business & Law and H100 exams. | Classification → handbook → references/ID → schedule authorized test. |
| DOPL Renewal | Odd-year renewal. | Computer → UtahID → My License One → Existing Holders → Actions → Renewal. |
| SCR | Project notices/lien tracking. | Account → Advanced Search → parcel/address → Track a Project. |
| Residence Lien Recovery | Potential homeowner Certificate of Compliance. | Choose contract-value route → checklist → gather payment/lien documents → submit timely. |
| DOPL Complaint | Licensing/unlicensed-practice complaint. | Identify respondent → timeline → evidence → declaration → submit. |
Related ContractorsBoard.org Resources
Utah Contractor Board Guide
Use this broader page when your main intent is the Utah licensing authority, application and board structure rather than lookup-first verification.
Utah Contractors Board GuideState Contractor License Directory
Use this when a contractor claims a credential from another state or the project crosses state lines.
State Contractors License Board Directory50-State License Check
Find official verification routes across U.S. states without treating one state’s licensing model as universal.
Contractor License Check DirectoryUtah Contractor License Lookup FAQs
What is the official Utah contractor license lookup?
The official search is Utah DOPL’s Licensee Lookup & Verification System hosted through Utah.gov. Search by license number when possible or use Name and Profession and select Contractor.
Is the Utah DOPL contractor license lookup free?
Yes. The public Licensee Lookup search is free. A separate official primary-source verification may carry a fee when an employer or another licensing agency needs a verification sent directly by Utah.
How do I search a Utah contractor by license number?
Open Licensee Lookup and choose License Number. Enter the core number. DOPL states that the core number can show licenses held by that licensee; entering the additional four-digit identifier targets the specific license when available.
Can I search a Utah contractor by business name?
Yes. Use Name and Profession. Try BEGINNING with for a precise legal-name search and CONTAINING when the company uses a shortened DBA or you do not know the full legal name. Narrow Profession to Contractor.
Why can’t I find a contractor in the Construction Business Registry?
CBR participation is optional. Only active construction professionals who opted into the registry appear. Absence from CBR is not proof that the contractor is unlicensed; verify status through DOPL Licensee Lookup.
What does Active on Probation mean in Utah?
DOPL states that it no longer distinguishes public display labels between Active on Probation and Restricted Active on Probation. Review DOPL disciplinary/action documents to understand the actual order, restrictions or terms.
How do I check disciplinary action against a Utah contractor?
Use DOPL’s Agency & Disciplinary Actions search. Searching by the exact license number helps prevent mistaken identity. Open relevant actions and review dates, findings, final disposition and any continuing restrictions.
What liability insurance does a Utah contractor need in 2026?
Current live DOPL contractor guidance uses at least $1 million per occurrence and $2 million aggregate. A March 5, 2026 contractor application PDF still contains earlier $3 million aggregate wording because it predates the subsequent rule adjustment. Use the current DOPL rule/live instructions.
Why does the Utah contractor application PDF show different insurance than the website?
The March 5, 2026 application was issued before the later 2026 aggregate-limit adjustment. DOPL’s current contractor announcement and current rule use $1 million per occurrence and $2 million aggregate. Applicants should follow the current rule and confirm any conflict with DOPL.
How much does a Utah contractor license application cost?
The current 2026 application formula is $50 for each qualifier plus $175 for each classification plus a $1 Electronic Reference Library surcharge. One qualifier and one classification therefore produces a $226 base application calculation before other applicable transaction or situation-specific fees.
How much experience is required for a Utah general contractor qualifier?
Current general-classification application material generally requires at least two years or 4,000 hours of paid construction-industry experience or another qualifying route, such as specified prior Utah qualifier experience, a Construction Management degree, Utah professional engineer licensure, NASCLA Commercial General Building examination or endorsement.
Does Utah offer contractor-license reciprocity?
DOPL calls the applicable pathway licensure by endorsement rather than reciprocity. A qualifying equivalent out-of-state license can simplify education/exam requirements, but the contractor must still apply for and receive the Utah license.
When do Utah contractor licenses expire?
Utah contractor licenses expire November 30 of odd-numbered years. The current DOPL fee schedule lists a $128 contractor renewal fee plus the separate electronic-library surcharge shown on the current fee schedule.
How much continuing education does a Utah contractor need?
Utah generally requires six hours of approved contractor continuing education during each two-year cycle. Current law requires at least three HVAC-related hours for H100 licensees and, effective May 6, 2026, at least one qualifying landscape water-conservation or fire-risk-management hour for the specialty contractors DOPL identifies as primarily engaged in landscape work.
Can a Utah handyman work without a contractor license?
Utah has a limited exemption for qualifying alteration, repair, remodeling, addition or improvement projects totaling less than $7,000, but important regulated trades are excluded. When an otherwise qualifying exempt project exceeds $3,000, current Utah requirements call for the applicable DOPL handyman registration/affirmation process.
What is the Utah State Construction Registry?
SCR is Utah’s construction-notice database. Homeowners can search their property for filings and use Track a Project for free email alerts. Contractors, subcontractors and suppliers use SCR filings for Utah construction notice and lien-right requirements.
How do I track lien notices on my Utah home?
Create a Utah.gov account, log into SCR, use Advanced Search to search the Tax Parcel ID or address, then use Track a Project with the County Tax Parcel ID to receive notifications of new filings.
Can DOPL remove a contractor lien from my home?
Utah has a Residence Lien Certificate of Compliance process for qualifying homeowners. If you are served with a lien-foreclosure complaint, DOPL’s current instructions contain a 30-day receipt deadline for the Certificate application. Obtain Utah legal advice immediately because DOPL does not act as your private attorney.
Does Utah’s Residence Lien Recovery Fund currently pay new claims?
DOPL currently states that the fund’s available balance is exhausted and it cannot pay new contractor, subcontractor or supplier claims. The homeowner Certificate of Compliance protection process remains separately relevant.
Does an active Utah contractor license mean my project has a permit?
No. DOPL licensing regulates the contractor. The project may separately require building, electrical, plumbing, mechanical, fire, zoning, demolition, historic or other permits from the authority serving the project address.
How do I file a complaint against a Utah contractor?
Use DOPL’s File a Complaint process for alleged violations of Utah occupational/professional licensing law. Identify the contractor, explain the matter chronologically and provide relevant contracts, payment records, communications, advertisements, photographs and permit records. DOPL does not recover private monetary damages for you.
What Utah contractor law changes on January 1, 2027?
Utah’s 2026 H.B. 40 recodification of the Construction Trades Licensing Act takes effect January 1, 2027, so statutory section numbers and structure should be rechecked after that date. DOPL also says H100 fingerprint-based background checks begin January 1, 2027.
Use the License Number as the Beginning of Verification—not the End
Hiring: DOPL status → legal entity → classification → discipline → insurance → local permits → State Construction Registry → written contract → payment/lien controls.
Applying: classification → qualifier → course → exam → experience → business registration → current insurance → workers’ comp → fee calculation → My License One.